Home solar in ZIP code 95004, California

Service city recorded on most installs: Aromas. County: Monterey County.

How many homes in ZIP code 95004 have solar?

PG&E, SCE and SDG&E interconnected 286 residential solar systems in ZIP code 95004 through Aug 31, 2026, 36 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Aromas, Monterey County, as the service city on 286 of them. Tesla Energy Operations (formerly SolarCity) has the most installs recorded in this ZIP, 50.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
286
Last 24 months
36 (Sep 2024 through Aug 2026)
Capacity
1,841.2 kW DC
Median system size
5.6 kW DC
Net Billing Tariff (NEM 3.0)
32 installs, 11.2% of those with a tariff recorded
Utility
PGE 286
First install in data
Mar 14, 2002
Latest install in data
Jul 24, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200220
200320
200420
200500
200650
200750
200800
200940
201050
201160
201270
201380
2014210
2015260
2016240
2017230
2018163
2019101
2020131
2021123
2022207
2023318
2024116
20252218
2026 (through Aug 31, 2026)119

Battery storage

19.6% of the residential solar installs here include battery storage across all years (56 of 286). In the last 24 months the share was 77.8% (28 of 36).

Net metering tariff

Of the 286 installs with a net metering tariff recorded: NEM 1.0 121 (42.3%), NEM 2.0 133 (46.5%), the Net Billing Tariff (often called NEM 3.0) 32 (11.2%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

21.3% of the 286 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 225 are recorded as not third-party owned. Ownership types recorded: PPA 52, lease 9.

Installers by installs in 95004

Installers with a page in this index, most installs in this ZIP first. 69 such installers have at least one install here. 13 more installs were by 13 installer names without a page in this index. 9 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 95004Last 24 months
Tesla Energy Operations (formerly SolarCity)501
Sunrun4312
Allterra Solar152
Solar Technologies123
BRIGHT FUTURE ENERGY91
GCI Solar90
SANDBAR84
Vivint Solar Developer, LLC70
BRIGHT OPS66
FREEDOM FOREVER LLC60

City and county recorded for 95004

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Aromas286
County: Monterey County245
County: San Benito County41

Common questions

How common are home batteries with solar in 95004?

19.6% of the residential solar installs here include battery storage across all years (56 of 286). In the last 24 months the share was 77.8% (28 of 36).

How many solar installs in 95004 are under NEM 3.0?

32 of the 286 installs here with a tariff recorded (11.2%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 95004?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Tesla Energy Operations (formerly SolarCity) (50), Sunrun (43), Allterra Solar (15). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.