How many solar installs has BRIGHT FUTURE ENERGY done in California, and which license number is on its installs?

BRIGHT FUTURE ENERGY has 268 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 30, 2019 to Jul 16, 2026), most of them in Monterey County (176), Santa Cruz County (39) and San Luis Obispo County (21). CSLB lists license 996617 (BRIGHT FUTURE ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-7, C-10, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
268
Last 24 months
35
Total capacity
2,031.9 kW DC
Median system size
6.7 kW DC
With battery storage
21.3% all time; 31.4% last 24 months
Third-party owned
1.5% of 268 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
15 installs, latest Apr 22, 2026
Ownership types recorded
lease 4
Median battery size
16 kWh (49 installs list a capacity)
First install
Oct 30, 2019
Latest install
Jul 16, 2026
Counties
12
Utilities
PGE 267, SCE 1
CSLB license
996617

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201990
2020446
2021446
20226015
20236113
2024229
2025134
2026 (through Aug 31, 2026)154

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

15 of its 268 interconnected installs (5.6% of the 268 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 22, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.4%not counted
NEM 2.025294.0%45 (17.9%)
Net Billing Tariff155.6%12 (80.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 4 of BRIGHT FUTURE ENERGY’s installs the utility recorded a third-party ownership type: PPA 0, lease 4, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches BRIGHT FUTURE ENERGY exactly.

Third-party owner named on its installsInstalls
RIGHT START ENERGY4

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 33 of BRIGHT FUTURE ENERGY’s 35 installs name a module maker in the “Generator Manufacturer” fields, and most of those (22, 66.7%) used modules recorded as Qcells.

In the last 24 months, 35 of BRIGHT FUTURE ENERGY’s 35 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (23, 65.7%) used inverters recorded as SolarEdge.

In the last 24 months, 8 of BRIGHT FUTURE ENERGY’s 35 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (4, 50.0%) used batteries recorded as SolarEdge.

38 of 57 battery-paired PG&E and SCE installs (66.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2294
LG9149
Trina Solar23
Shanghai PYTES Energy Co., Ltd.1not in top list
SimpliPhi Power, Inc.12
Inverter makerSolarEdge23198
Enphase853
Sol-Ark27
SMA111
SunPower1not in top list
Battery makerSolarEdge44
Enphase27
LG126
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 248 of 268 installs, inverters on 267. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
996617BRIGHT FUTURE ENERGY (Corporation)CLEAR, WC Susp PendingB General Building Contractor; C-7; C-10 Electrical ContractorSep 11, 2014Sep 30, 2028268

License numbers are the ones the utilities recorded on the interconnection applications (268 of 268 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 996617. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Monterey176
Santa Cruz39
San Luis Obispo21
San Benito12
Santa Barbara8
Santa Clara4
Sonoma3
Contra Costa1
Fresno1
Nevada1
Placer1
San Mateo1

Top cities

CityInstalls
Salinas77
Monterey18
Carmel16
Watsonville12
Carmel Valley10
Aptos9
Aromas9
Hollister8
Pacific Grove8
Pebble Beach7
San Luis Obispo7
Santa Cruz7
Marina6
Paso Robles5
Santa Maria5

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BRIGHT FUTURE ENERGY268

Common questions

Where does BRIGHT FUTURE ENERGY install solar?

Its installs are spread across 12 counties. The most are in Monterey County (176 installs), followed by Santa Cruz County (39).

How often does BRIGHT FUTURE ENERGY install batteries with solar?

21.3% of its interconnected solar installs include battery storage across all years, and 31.4% in the last 24 months (11 of 35).

How many BRIGHT FUTURE ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

15 of its 268 interconnected installs (5.6% of the 268 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.