Allterra Solar has 2,840 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Dec 19, 2013 to Aug 31, 2026), most of them in Santa Cruz County (2,248), Monterey County (270) and Santa Clara County (197). CSLB lists license 847973 (ALLTERRA SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, B, C-46, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,840
Last 24 months
360
Total capacity
16,034.8 kW DC
Median system size
5 kW DC
With battery storage
10.7% all time; 54.7% last 24 months
Third-party owned
0.1% of 2,840 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
235 installs, latest Aug 31, 2026
Ownership types recorded
PPA 1, lease 2
Median battery size
20.3 kWh (6 installs list a capacity)
First install
Dec 19, 2013
Latest install
Aug 31, 2026
Counties
11
Utilities
PGE 2,840
CSLB license
847973

Is Allterra Solar still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (172 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201320
2014790
20152150
20162810
20171910
20182050
201923013
202018813
202122523
202229724
202336316
202427336
2025193111
2026 (through Aug 31, 2026)9869

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

235 of its 2,840 interconnected installs (8.3% of the 2,840 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.060021.1%not counted
NEM 2.02,00570.6%101 (5.0%)
Net Billing Tariff2358.3%196 (83.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 3 of Allterra Solar’s installs the utility recorded a third-party ownership type: PPA 1, lease 2, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Allterra Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Allterra Solar1
Sunpower1
Sunpower Capitol, LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 324 of Allterra Solar’s 360 installs name a module maker in the “Generator Manufacturer” fields, and most of those (189, 58.3%) used modules recorded as REC.

In the last 24 months, 360 of Allterra Solar’s 360 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (357, 99.2%) used inverters recorded as Enphase.

In the last 24 months, 173 of Allterra Solar’s 360 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (87, 50.3%) used batteries recorded as Tesla.

237 of 305 battery-paired PG&E and SCE installs (77.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC189201
Panasonic105638
JA Solar32not in top list
LG9964
SolarWorld9365
Inverter makerEnphase3572,519
Tesla103181
FranklinWH3838
SMA9226
SunPower7162
Battery makerTesla87122
Enphase4882
FranklinWH3838

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,552 of 2,840 installs, inverters on 2,840. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Allterra Solar as developer on 0 battery storage projects and as installer on 460 (0 name it as both), 460 projects in all with 8,885 kWh of storage. 370 have the status Paid, with $2,348,078 in current incentive allocations. Applications were received from May 15, 2018 to Dec 19, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid3707,127$2,348,078
Cancelled761,452$339,664
RRF Rejected14306$45,400

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage3646,460$1,241,405304$1,059,510
Equity Resiliency561,281$1,263,15152$1,177,741
Large-Scale Storage26838$183,18714$110,828
Not stated14306$45,4000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
847973ALLTERRA SOLAR (Corporation)CLEARA General Engineering Contractor; B General Building Contractor; C-46 Solar ContractorOct 8, 2004Oct 31, 20282,823

License numbers are the ones the utilities recorded on the interconnection applications (2,833 of 2,840 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 847973. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Santa Cruz2,248
Monterey270
Santa Clara197
San Mateo66
San Benito47
Alameda5
Contra Costa2
El Dorado2
Madera1
San Luis Obispo1
Sonoma1

Top cities

CityInstalls
Santa Cruz1,301
Aptos287
Watsonville204
Scotts Valley131
Soquel119
Salinas95
San Jose74
Los Gatos57
Capitola51
Felton46
Monterey43
Hollister40
Boulder Creek37
Ben Lomond36
Half Moon Bay23

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ALLTERRA SOLAR1,700
Allterra Solar1,140

Common questions

Where does Allterra Solar install solar?

Its installs are spread across 11 counties. The most are in Santa Cruz County (2,248 installs), followed by Monterey County (270).

How often does Allterra Solar install batteries with solar?

10.7% of its interconnected solar installs include battery storage across all years, and 54.7% in the last 24 months (197 of 360).

How many Allterra Solar installs are under NEM 3.0 (the Net Billing Tariff)?

235 of its 2,840 interconnected installs (8.3% of the 2,840 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.