Allterra Environmental, Inc.
How many solar installs has Allterra Environmental, Inc. done in California, and which license number is on its installs?
Allterra Environmental, Inc. has 217 residential solar installs interconnected in California, active in the records from 2009 through 2017 (Sep 9, 2009 to Nov 30, 2017), most of them in Santa Cruz County (129), Santa Clara County (60) and San Mateo County (16). CSLB lists license 847973 (ALLTERRA SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, B, C-46, expires Oct 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 217
- Last 24 months
- 0
- Total capacity
- 1,009.9 kW DC
- Median system size
- 4.1 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 0.0% of 217 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- none recorded
- First install
- Sep 9, 2009
- Latest install
- Nov 30, 2017
- Counties
- 4
- Utilities
- PGE 217
- CSLB license
- 847973
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2009 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2009 | 2 | 0 |
| 2010 | 0 | 0 |
| 2011 | 7 | 0 |
| 2012 | 37 | 0 |
| 2013 | 64 | 0 |
| 2014 | 95 | 0 |
| 2015 | 8 | 0 |
| 2016 | 1 | 0 |
| 2017 | 3 | 0 |
| 2018 | 0 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 217 interconnected installs with a tariff recorded (217) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 214 | 98.6% | not counted |
| NEM 2.0 | 3 | 1.4% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on Allterra Environmental, Inc.’s installs. No residential system in the file lists a third-party owner name that matches Allterra Environmental, Inc. exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 210 of Allterra Environmental, Inc.’s 217 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (105, 50.0%) used modules recorded as SunPower.
Across all years, 217 of Allterra Environmental, Inc.’s 217 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (105, 48.4%) used inverters recorded as Enphase.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SunPower | 0 | 105 |
| SolarWorld | 0 | 76 | |
| Kyocera | 0 | 17 | |
| Suniva | 0 | 9 | |
| Schuco USA LP | 0 | 2 | |
| Inverter maker | Enphase | 0 | 105 |
| Power-One | 0 | 52 | |
| SunPower | 0 | 46 | |
| SMA | 0 | 15 | |
| Fronius | 0 | 2 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 210 of 217 installs, inverters on 217. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Allterra Environmental, Inc. as developer on 462 battery storage projects and as installer on 2 (2 name it as both), 462 projects in all with 8,918 kWh of storage. 372 have the status Paid, with $2,340,234 in current incentive allocations. Applications were received from May 1, 2017 to Dec 19, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 372 | 7,160 | $2,340,234 |
| Cancelled | 76 | 1,452 | $339,664 |
| RRF Rejected | 14 | 306 | $45,400 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 367 | 6,520 | $1,259,961 | 307 | $1,078,066 |
| Equity Resiliency | 55 | 1,255 | $1,236,751 | 51 | $1,151,341 |
| Large-Scale Storage | 26 | 838 | $183,187 | 14 | $110,828 |
| Not stated | 14 | 306 | $45,400 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 847973 | ALLTERRA SOLAR (Corporation) | CLEAR | A General Engineering Contractor; B General Building Contractor; C-46 Solar Contractor | Oct 8, 2004 | Oct 31, 2028 | 108 |
License numbers are the ones the utilities recorded on the interconnection applications (108 of 217 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 847973. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- Allterra Solar: 2,840 installs, license 847973
Counties
| County | Installs |
|---|---|
| Santa Cruz | 129 |
| Santa Clara | 60 |
| San Mateo | 16 |
| Monterey | 12 |
Top cities
| City | Installs |
|---|---|
| Santa Cruz | 77 |
| San Jose | 33 |
| Aptos | 17 |
| Scotts Valley | 9 |
| Los Altos | 8 |
| Watsonville | 8 |
| Soquel | 6 |
| Los Gatos | 5 |
| Salinas | 5 |
| Ben Lomond | 4 |
| Campbell | 3 |
| Felton | 3 |
| Atherton | 2 |
| Capitola | 2 |
| Carmel Valley | 2 |
Names as recorded by the utilities
The utilities recorded this installer under 21 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Allterra Environmental, Inc. | 65 |
| Allterra Environmental, Inc. dba Allterr | 56 |
| Allterra Environmental Inc, dba Allterra | 35 |
| Allterra Environmental, Inc | 14 |
| Allterra Environmental, Inc dba Allterra | 12 |
| Allterra Environmental | 6 |
| Allterra Environmental Inc | 6 |
| Allterra Environmental Inc dba Allterra | 5 |
| Allterra Environmental Inc. | 3 |
| Allterra Environmental,Inc. dba Allterra | 3 |
| Allterra Environmental Inc, | 2 |
| ALLTERRA ENVIRONMENTAL INC | 1 |
| Allterra Environmental Inc. dba Allterra | 1 |
| Allterra environmental, Inc dba Allterra | 1 |
| Allterra Environmental, Inc DBA Allterra | 1 |
| ALLTERRA ENVIRONMENTAL, INC DBA ALLTERRA | 1 |
| Allterra Environmental, Inc dba Alterra | 1 |
| Allterra Environmental, Inc. dba Allter | 1 |
| Allterra Environmental, Inc. DBA Allter | 1 |
| Allterra Environmental, Inc. DBA Allterr | 1 |
| Allterra Environmental, INC. dba Allterr | 1 |
Common questions
Where does Allterra Environmental, Inc. install solar?
Its installs are spread across 4 counties. The most are in Santa Cruz County (129 installs), followed by Santa Clara County (60).
How often does Allterra Environmental, Inc. install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many Allterra Environmental, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 217 interconnected installs with a tariff recorded (217) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.