The most recent install credited to Allterra Solar in California’s interconnection data was approved in August 2026; it has 172 in the last 12 complete months (September 2025 through August 2026). CSLB lists license 847973 (ALLTERRA SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, B, C-46, expires Oct 31, 2028, the number recorded on 172 of those installs.

The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy.

Latest install approved
Aug 31, 2026
Last 12 complete months
172 installs, September 2025 through August 2026
Last 24 months
360 installs
All time
2,840 installs, first approved Dec 19, 2013
License on most recent installs
847973, ALLTERRA SOLAR, CSLB status CLEAR in the License Master file pulled Nov 4, 2026
Full record
Allterra Solar installer page

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs in each of the last 12 complete months

Month approvedInstalls credited to Allterra Solar
August 202610
July 20269
June 202611
May 202615
April 202615
March 202613
February 20268
January 202617
December 202520
November 202516
October 202518
September 202520
Total172

Net Billing Tariff installs

235 of the installs credited to Allterra Solar (8.3% of the 2,840 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.4% of those include battery storage. The latest was approved Aug 31, 2026.

Installs by year

YearInstalls interconnectedWith battery storage
201320
2014790
20152150
20162810
20171910
20182050
201923013
202018813
202122523
202229724
202336316
202427336
2025193111
2026 (through Aug 31, 2026)9869

License numbers on installs in the last 12 months

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsExpiresInstalls
847973ALLTERRA SOLARCLEARA General Engineering Contractor; B General Building Contractor; C-46 Solar ContractorOct 31, 2028172

Names written on these installs: ALLTERRA SOLAR (172). 172 of the 172 carry a CSLB number. Numbers on fewer than 3 installs or 1% of them are left out as likely typos.

Other installer names in the records

Installer names that share a license number with Allterra Solar, or contain the same brand word. A shared word or number does not by itself mean the same company.

InstallerWhy listedLatest installLast 12 monthsAll time
Allterra Environmental, Inc.same license 847973November 20170217

How to read this record

Each install is a home solar system that Pacific Gas and Electric, Southern California Edison or San Diego Gas & Electric approved to connect to the grid. The month is the App Approved date, which comes after the system is installed. The installer is the name written on the interconnection application. Counts run through Aug 31, 2026, the latest date in the DG Stats file Interconnected_Project_Sites_2026-08-31.zip.

To check a license today, use CSLB’s license check. See every installer’s latest install and the large installers with no installs in the last six months.

Common questions

When was the last install credited to Allterra Solar approved?

The latest App Approved date on an install credited to Allterra Solar is Aug 31, 2026, in the DG Stats file current through Aug 31, 2026. Its first was Dec 19, 2013.

How many solar installs has Allterra Solar had in California in the last 12 months?

172 residential solar installs credited to Allterra Solar were approved for interconnection from September 2025 through August 2026. Across all years it has 2,840.

Does a recent install mean Allterra Solar is still in business?

No. The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy. An installer name can stay on applications filed before a change, and a business can work under a new name or license.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. Neither record states whether a company is in business. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.