POWER ON SOLAR

How many solar installs has POWER ON SOLAR done in California, and which license number is on its installs?

POWER ON SOLAR has 40 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Mar 31, 2025 to Aug 28, 2026), most of them in Contra Costa County (11), Alameda County (8) and San Joaquin County (6). CSLB lists license 1052317 (POWER ON SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
40
Last 24 months
40
Total capacity
314.2 kW DC
Median system size
7.3 kW DC
With battery storage
82.5% all time; 82.5% last 24 months
Third-party owned
5.0% of 40 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
37 installs, latest Aug 28, 2026
Ownership types recorded
PPA 1, lease 1
Median battery size
13.8 kWh (20 installs list a capacity)
First install
Mar 31, 2025
Latest install
Aug 28, 2026
Counties
11
Utilities
PGE 39, SCE 1
CSLB license
1052317

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2025 to 2026

YearInstalls interconnectedWith battery storage
20252320
2026 (through Aug 31, 2026)1713

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

37 of its 40 interconnected installs (92.5% of the 40 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.1% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012.5%not counted
NEM 2.025.0%2 (100.0%)
Net Billing Tariff3792.5%30 (81.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of POWER ON SOLAR’s installs the utility recorded a third-party ownership type: PPA 1, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches POWER ON SOLAR exactly.

Third-party owner named on its installsInstalls
GoodLeap. LLC2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 38 of POWER ON SOLAR’s 40 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (11, 28.9%) used modules recorded as Qcells.

In the last 24 months, 40 of POWER ON SOLAR’s 40 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (17, 42.5%) used inverters recorded as Tesla.

In the last 24 months, 28 of POWER ON SOLAR’s 40 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (15, 53.6%) used batteries recorded as Tesla.

28 of 33 battery-paired PG&E and SCE installs (84.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1111
SunPower1010
Waaree99
Elin Energy33
Hyundai22
Inverter makerTesla1717
Enphase1414
SolarEdge99
SunPower66
Qcells44
Battery makerTesla1515
SolarEdge66
SunPower33
Enphase22
FranklinWH22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 38 of 40 installs, inverters on 40. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1052317POWER ON SOLAR (Limited Liability)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorApr 12, 2019Apr 30, 202740

License numbers are the ones the utilities recorded on the interconnection applications (40 of 40 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1052317. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list POWER ON SOLAR’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2019202020242025Total
City and County of San Francisco105231700112
unincorporated Marin County105231712003

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Contra Costa11
Alameda8
San Joaquin6
Amador4
San Mateo4
Santa Clara2
Fresno1
San Bernardino1
San Francisco1
Santa Cruz1
Sonoma1

Top cities

CityInstalls
Jackson4
Pleasanton4
San Ramon4
San Mateo3
Tracy3
Alamo2
Stockton2
Antioch1
Barstow1
Berkeley1
Burlingame1
Cupertino1
Danville1
Diablo1
Fresno1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
POWER ON SOLAR40

Common questions

Where does POWER ON SOLAR install solar?

Its installs are spread across 11 counties. The most are in Contra Costa County (11 installs), followed by Alameda County (8).

How often does POWER ON SOLAR install batteries with solar?

82.5% of its interconnected solar installs include battery storage across all years, and 82.5% in the last 24 months (33 of 40).

How many POWER ON SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

37 of its 40 interconnected installs (92.5% of the 40 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.