SunnyCal Solar Inc

How many solar installs has SunnyCal Solar Inc done in California, and which license number is on its installs?

SunnyCal Solar Inc has 140 residential solar installs interconnected in California, active in the records from 2014 through 2024 (May 1, 2014 to Aug 12, 2024), most of them in Amador County (83), Calaveras County (35) and San Joaquin County (8). CSLB lists license 990589 (SUNNYCAL SOLAR INCORPORATED) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
140
Last 24 months
0
Total capacity
1,023 kW DC
Median system size
6.9 kW DC
With battery storage
0.7% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 140 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Jul 18, 2024
Ownership types recorded
none recorded
Median battery size
40 kWh (1 installs list a capacity)
First install
May 1, 2014
Latest install
Aug 12, 2024
Counties
8
Utilities
PGE 140
CSLB license
990589

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014100
2015170
2016230
2017160
2018110
2019150
202090
2021110
2022111
2023140
202430
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 140 interconnected installs (0.7% of the 140 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 18, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05035.7%not counted
NEM 2.08963.6%1 (1.1%)
Net Billing Tariff10.7%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SunnyCal Solar Inc’s installs. No residential system in the file lists a third-party owner name that matches SunnyCal Solar Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 140 of SunnyCal Solar Inc’s 140 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (68, 48.6%) used modules recorded as Axitec.

Across all years, 139 of SunnyCal Solar Inc’s 140 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (58, 41.7%) used inverters recorded as Fronius.

0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAxitec068
Stion011
VSUN (Vietnam Sunergy)09
SolarWorld08
Topsun08
Inverter makerFronius058
ABB020
SolarEdge014
GoodWe Technologies Co., Ltd.013
SMA012

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 140 of 140 installs, inverters on 139. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SunnyCal Solar Inc as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 500 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Feb 23, 2016 to Feb 23, 2016.

By status

Status as publishedProjectsStorage kWhCurrent incentive
PBI in Process1500$393,000

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Not stated1500$393,0000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
990589SUNNYCAL SOLAR INCORPORATED (Corporation)CLEAR, Pending Case/CITB General Building Contractor; C-46 Solar ContractorFeb 13, 2014Feb 29, 2028140

License numbers are the ones the utilities recorded on the interconnection applications (140 of 140 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 990589. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Amador83
Calaveras35
San Joaquin8
Santa Clara7
Tuolumne3
El Dorado2
Alameda1
Contra Costa1

Top cities

CityInstalls
Sutter Creek16
Jackson15
Pine Grove14
Plymouth11
Valley Springs11
Ione9
Pioneer8
Volcano7
West Point6
Mokelumne Hill5
Mountain Ranch4
Rail Road Flat4
Clements3
San Jose3
Campbell2

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SunnyCal Solar Inc61
SUNNYCAL SOLAR INCORPORATED50
SunnyCal Solar Inc.23
SunnyCal Solar2
Sunnycal Solar Inc.2
SunnyCal Solar inc1
SUnnyCal Solar Inc1

Common questions

Where does SunnyCal Solar Inc install solar?

Its installs are spread across 8 counties. The most are in Amador County (83 installs), followed by Calaveras County (35).

How often does SunnyCal Solar Inc install batteries with solar?

0.7% of its interconnected solar installs include battery storage across all years.

How many SunnyCal Solar Inc installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 140 interconnected installs (0.7% of the 140 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.