Excel Electric Inc
How many solar installs has Excel Electric Inc done in California, and which license number is on its installs?
Excel Electric Inc has 39 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Apr 26, 2010 to Mar 22, 2026), most of them in Amador County (31), Calaveras County (6) and Los Angeles County (1). CSLB lists license 791536 (EXCEL ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Feb 28, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 39
- Last 24 months
- 5
- Total capacity
- 274.2 kW DC
- Median system size
- 7.3 kW DC
- With battery storage
- 2.6% all time; 20.0% last 24 months
- Third-party owned
- 0.0% of 38 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 3 installs, latest Mar 22, 2026
- Ownership types recorded
- none recorded
- First install
- Apr 26, 2010
- Latest install
- Mar 22, 2026
- Counties
- 4
- Utilities
- PGE 38, SCE 1
- CSLB license
- 791536
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2010 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2010 | 2 | 0 |
| 2011 | 1 | 0 |
| 2012 | 3 | 0 |
| 2013 | 2 | 0 |
| 2014 | 1 | 0 |
| 2015 | 2 | 0 |
| 2016 | 3 | 0 |
| 2017 | 3 | 0 |
| 2018 | 0 | 0 |
| 2019 | 1 | 0 |
| 2020 | 3 | 0 |
| 2021 | 0 | 0 |
| 2022 | 3 | 0 |
| 2023 | 10 | 0 |
| 2024 | 0 | 0 |
| 2025 | 4 | 1 |
| 2026 (through Aug 31, 2026) | 1 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
3 of its 39 interconnected installs (7.7% of the 39 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The latest Net Billing Tariff install was approved Mar 22, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 14 | 35.9% | not counted |
| NEM 2.0 | 22 | 56.4% | 0 (0.0%) |
| Net Billing Tariff | 3 | 7.7% | 1 (33.3%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on Excel Electric Inc’s installs. No residential system in the file lists a third-party owner name that matches Excel Electric Inc exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 5 of Excel Electric Inc’s 5 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 80.0%) used modules recorded as Qcells.
In the last 24 months, 5 of Excel Electric Inc’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 100.0%) used inverters recorded as Enphase.
In the last 24 months, 1 of Excel Electric Inc’s 5 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.
1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 4 | 18 |
| REC | 1 | not in top list | |
| Inverter maker | Enphase | 5 | 17 |
| Battery maker | Enphase | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 37 of 39 installs, inverters on 39. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 791536 | EXCEL ELECTRIC INC (Corporation) | CLEAR | B General Building Contractor; C-10 Electrical Contractor | Feb 20, 2001 | Feb 28, 2027 | 31 |
License numbers are the ones the utilities recorded on the interconnection applications (31 of 39 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 791536. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Counties
| County | Installs |
|---|---|
| Amador | 31 |
| Calaveras | 6 |
| Los Angeles | 1 |
| San Joaquin | 1 |
Top cities
| City | Installs |
|---|---|
| Jackson | 17 |
| Sutter Creek | 6 |
| Ione | 5 |
| Mokelumne Hill | 4 |
| Fiddletown | 1 |
| La Canada Flintridge | 1 |
| Lodi | 1 |
| Pine Grove | 1 |
| Plymouth | 1 |
| Valley Springs | 1 |
| Wallace | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| EXCEL ELECTRIC INC | 20 |
| Excel Electric Inc | 18 |
| Excel Electric Inc. | 1 |
Common questions
Where does Excel Electric Inc install solar?
Its installs are spread across 4 counties. The most are in Amador County (31 installs), followed by Calaveras County (6).
How often does Excel Electric Inc install batteries with solar?
2.6% of its interconnected solar installs include battery storage across all years, and 20.0% in the last 24 months (1 of 5).
How many Excel Electric Inc installs are under NEM 3.0 (the Net Billing Tariff)?
3 of its 39 interconnected installs (7.7% of the 39 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.