ROI SOLAR INC

How many solar installs has ROI SOLAR INC done in California, and which license number is on its installs?

ROI SOLAR INC has 40 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Sep 4, 2025 to Aug 26, 2026), most of them in Amador County (7), Alameda County (6) and Santa Clara County (5). CSLB lists license 1082435 (ROI SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Aug 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
40
Last 24 months
40
Total capacity
281.5 kW DC
Median system size
6.9 kW DC
With battery storage
92.5% all time; 92.5% last 24 months
Third-party owned
7.5% of 40 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
35 installs, latest Aug 26, 2026
Ownership types recorded
PPA 2, lease 1
Median battery size
13.5 kWh (22 installs list a capacity)
First install
Sep 4, 2025
Latest install
Aug 26, 2026
Counties
15
Utilities
PGE 40
CSLB license
1082435

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2025 to 2026

YearInstalls interconnectedWith battery storage
202598
2026 (through Aug 31, 2026)3129

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

35 of its 40 interconnected installs (87.5% of the 40 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.1% of those include battery storage. The latest Net Billing Tariff install was approved Aug 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.025.0%not counted
NEM 2.037.5%1 (33.3%)
Net Billing Tariff3587.5%34 (97.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 3 of ROI SOLAR INC’s installs the utility recorded a third-party ownership type: PPA 2, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches ROI SOLAR INC exactly.

Third-party owner named on its installsInstalls
Enfin2
Sun Power1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 40 of ROI SOLAR INC’s 40 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (14, 35.0%) used modules recorded as Hyundai.

In the last 24 months, 40 of ROI SOLAR INC’s 40 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (22, 55.0%) used inverters recorded as Tesla.

In the last 24 months, 27 of ROI SOLAR INC’s 40 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (17, 63.0%) used batteries recorded as Tesla.

27 of 37 battery-paired PG&E and SCE installs (73.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai1414
Qcells1111
JA Solar88
REC33
SunPower33
Inverter makerTesla2222
Enphase1010
PointGuard Energy Inc.66
Sigenergy55
Fronius33
Battery makerTesla1717
PointGuard Energy Inc.44
Sigenergy33
Enphase22
SunPower11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 40 of 40 installs, inverters on 40. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ROI SOLAR INC as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 26 kWh of storage. 2 have the status Paid, with $3,960 in current incentive allocations. Applications were received from Sep 2, 2025 to Sep 2, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid226$3,960

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage226$3,9602$3,960

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1082435ROI SOLAR INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorOct 12, 2021Aug 31, 202740

License numbers are the ones the utilities recorded on the interconnection applications (40 of 40 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1082435. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Amador7
Alameda6
Santa Clara5
Contra Costa4
Solano4
Marin2
Placer2
San Joaquin2
Yolo2
Calaveras1
Merced1
Santa Cruz1
Shasta1
Sonoma1
Stanislaus1

Top cities

CityInstalls
Fremont3
Sutter Creek3
Lafayette2
San Jose2
Winters2
Albany1
Atwater1
Campbell1
Clements1
Corte Madera1
Danville1
Davis1
Fairfield1
Felton1
Fiddletown1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ROI SOLAR INC40

Common questions

Where does ROI SOLAR INC install solar?

Its installs are spread across 15 counties. The most are in Amador County (7 installs), followed by Alameda County (6).

How often does ROI SOLAR INC install batteries with solar?

92.5% of its interconnected solar installs include battery storage across all years, and 92.5% in the last 24 months (37 of 40).

How many ROI SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

35 of its 40 interconnected installs (87.5% of the 40 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.