Sunlectric

How many solar installs has Sunlectric done in California, and which license number is on its installs?

Sunlectric has 490 residential solar installs interconnected in California, active in the records from 2015 through 2026 (May 21, 2015 to Feb 10, 2026), most of them in San Joaquin County (193), Stanislaus County (152) and Calaveras County (49). CSLB lists license 944530 (SUNLECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
490
Last 24 months
14
Total capacity
4,459.8 kW DC
Median system size
8.3 kW DC
With battery storage
3.1% all time; 50.0% last 24 months
Third-party owned
10.0% of 490 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
8 installs, latest Jan 15, 2026
Ownership types recorded
lease 49
Median battery size
30 kWh (5 installs list a capacity)
First install
May 21, 2015
Latest install
Feb 10, 2026
Counties
11
Utilities
PGE 490
CSLB license
944530

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015190
2016340
2017270
2018240
2019370
2020770
2021770
2022984
2023793
202483
202562
2026 (through Aug 31, 2026)43

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

8 of its 490 interconnected installs (1.6% of the 490 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Jan 15, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05411.0%not counted
NEM 2.042887.3%7 (1.6%)
Net Billing Tariff81.6%8 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 49 of Sunlectric’s installs the utility recorded a third-party ownership type: PPA 0, lease 49, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Sunlectric exactly.

Third-party owner named on its installsInstalls
Sunpower Capital36
Sunpower10
Sunpower Captial2
Sunpower Capial1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 13 of Sunlectric’s 14 installs name a module maker in the “Generator Manufacturer” fields, and most of those (7, 53.8%) used modules recorded as Qcells.

In the last 24 months, 14 of Sunlectric’s 14 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (8, 57.1%) used inverters recorded as Enphase.

In the last 24 months, 3 of Sunlectric’s 14 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used batteries recorded as FranklinWH.

8 of 15 battery-paired PG&E and SCE installs (53.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells7101
Discover Energy Systems Corp.4not in top list
JA Solar3not in top list
Hyundai2not in top list
LG147
Inverter makerEnphase8162
Sol-Ark4not in top list
FranklinWH3not in top list
SMA213
Qcells19
Battery makerFranklinWH33

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 458 of 490 installs, inverters on 490. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
944530SUNLECTRIC INC (Corporation)CLEARC-10 Electrical ContractorMar 17, 2010Oct 31, 2027490

License numbers are the ones the utilities recorded on the interconnection applications (490 of 490 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 944530. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Joaquin193
Stanislaus152
Calaveras49
Tuolumne48
Mariposa23
Merced16
Contra Costa3
Alameda2
Amador2
Placer1
Sonoma1

Top cities

CityInstalls
Oakdale123
Stockton77
Manteca41
Sonora25
Tracy25
La Grange23
Angels Camp17
Riverbank17
Ripon16
Escalon13
Copperopolis12
Mariposa9
Coulterville7
Jamestown7
Linden7

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNLECTRIC INC362
Sunlectric79
Sunlectric Inc26
Sunlectric, Inc.16
sunlectric inc3
sunlectric Inc2
Sunlectric Inc.1
Sunlectric, Inc1

Common questions

Where does Sunlectric install solar?

Its installs are spread across 11 counties. The most are in San Joaquin County (193 installs), followed by Stanislaus County (152).

How often does Sunlectric install batteries with solar?

3.1% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (7 of 14).

How many Sunlectric installs are under NEM 3.0 (the Net Billing Tariff)?

8 of its 490 interconnected installs (1.6% of the 490 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.