RODRIGUEZ BROS ELECTRIC

How many solar installs has RODRIGUEZ BROS ELECTRIC done in California, and which license number is on its installs?

RODRIGUEZ BROS ELECTRIC has 168 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Aug 15, 2022 to Jul 20, 2026), most of them in San Joaquin County (57), Fresno County (25) and Tulare County (18). CSLB lists license 1077081 (RODRIGUEZ BROS ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
168
Last 24 months
145
Total capacity
1,293 kW DC
Median system size
7.2 kW DC
With battery storage
96.4% all time; 100.0% last 24 months
Third-party owned
87.5% of 168 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
152 installs, latest Jul 20, 2026
Ownership types recorded
PPA 146, lease 1
Median battery size
11.8 kWh (56 installs list a capacity)
First install
Aug 15, 2022
Latest install
Jul 20, 2026
Counties
21
Utilities
PGE 137, SCE 31
CSLB license
1077081

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202210
202320
20244441
20259393
2026 (through Aug 31, 2026)2828

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

152 of its 168 interconnected installs (90.5% of the 168 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 99.3% of those include battery storage. The latest Net Billing Tariff install was approved Jul 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.031.8%not counted
NEM 2.0137.7%8 (61.5%)
Net Billing Tariff15290.5%151 (99.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 147 of RODRIGUEZ BROS ELECTRIC’s installs the utility recorded a third-party ownership type: PPA 146, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches RODRIGUEZ BROS ELECTRIC exactly.

Third-party owner named on its installsInstalls
Everbright83
GoodLeap54
Sunnova7
Solrite Energy2
SOLRITE1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 124 of RODRIGUEZ BROS ELECTRIC’s 145 installs name a module maker in the “Generator Manufacturer” fields, and most of those (121, 97.6%) used modules recorded as Qcells.

In the last 24 months, 145 of RODRIGUEZ BROS ELECTRIC’s 145 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (119, 82.1%) used inverters recorded as Enphase.

In the last 24 months, 123 of RODRIGUEZ BROS ELECTRIC’s 145 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (92, 74.8%) used batteries recorded as Enphase.

136 of 162 battery-paired PG&E and SCE installs (84.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells121135
Canadian Solar33
SolarWorld33
JA Solar22
LONGi2not in top list
Inverter makerEnphase119139
Tesla2929
SolarEdge1719
SunPower34
ABB22
Battery makerEnphase92103
Tesla3131
SolarEdge11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 143 of 168 installs, inverters on 168. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1077081RODRIGUEZ BROS ELECTRIC (Corporation)CLEARC-10 Electrical ContractorJun 17, 2021Jun 30, 2027167

License numbers are the ones the utilities recorded on the interconnection applications (168 of 168 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1077081. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Joaquin57
Fresno25
Tulare18
Kings12
Merced11
Stanislaus9
Santa Clara8
Kern6
Madera3
Solano3
Alameda2
Calaveras2
Contra Costa2
Monterey2
San Benito2
Mariposa1
Riverside1
San Mateo1
Sutter1
Tuolumne1
Yuba1

Top cities

CityInstalls
Stockton41
Fresno18
Visalia10
Hanford9
Los Banos5
Oakdale5
San Jose5
Tracy5
Manteca4
Tulare4
Escalon3
Gilroy3
Madera3
Merced3
Avenal2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
RODRIGUEZ BROS ELECTRIC159
RODRIGUEZ BROS ELECTRIC INC8
Rodriguez Bros Electric Inc1

Common questions

Where does RODRIGUEZ BROS ELECTRIC install solar?

Its installs are spread across 21 counties. The most are in San Joaquin County (57 installs), followed by Fresno County (25).

How often does RODRIGUEZ BROS ELECTRIC install batteries with solar?

96.4% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (145 of 145).

How many RODRIGUEZ BROS ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

152 of its 168 interconnected installs (90.5% of the 168 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 99.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.