Home solar in ZIP code 95361, California
Service city recorded on most installs: Oakdale. County: Stanislaus County.
How many homes in ZIP code 95361 have solar?
PG&E, SCE and SDG&E interconnected 3,410 residential solar systems in ZIP code 95361 through Aug 31, 2026, 447 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Oakdale, Stanislaus County, as the service city on 3,384 of them. SIG SOLAR, S.I.G. has the most installs recorded in this ZIP, 523.
Counts of interconnected systems from utility records, not a rating of any installer.
Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
At a glance
- Residential solar installs
- 3,410
- Last 24 months
- 447 (Sep 2024 through Aug 2026)
- Capacity
- 31 MW DC
- Median system size
- 8.1 kW DC
- Net Billing Tariff (NEM 3.0)
- 502 installs, 14.7% of those with a tariff recorded
- Utility
- PGE 3,410
- First install in data
- May 21, 2003
- Latest install in data
- Aug 26, 2026
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2003 | 6 | 0 |
| 2004 | 10 | 0 |
| 2005 | 15 | 0 |
| 2006 | 19 | 0 |
| 2007 | 16 | 0 |
| 2008 | 17 | 0 |
| 2009 | 21 | 0 |
| 2010 | 40 | 0 |
| 2011 | 31 | 0 |
| 2012 | 41 | 0 |
| 2013 | 66 | 0 |
| 2014 | 155 | 0 |
| 2015 | 255 | 0 |
| 2016 | 229 | 0 |
| 2017 | 179 | 1 |
| 2018 | 206 | 4 |
| 2019 | 249 | 2 |
| 2020 | 243 | 4 |
| 2021 | 284 | 7 |
| 2022 | 369 | 17 |
| 2023 | 339 | 35 |
| 2024 | 248 | 151 |
| 2025 | 261 | 187 |
| 2026 (through Aug 31, 2026) | 111 | 86 |
Battery storage
14.5% of the residential solar installs here include battery storage across all years (494 of 3,410). In the last 24 months the share was 72.0% (322 of 447).
Net metering tariff
Of the 3,410 installs with a net metering tariff recorded: NEM 1.0 932 (27.3%), NEM 2.0 1,976 (57.9%), the Net Billing Tariff (often called NEM 3.0) 502 (14.7%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Lease, PPA or owned
24.5% of the 3,410 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 2,574 are recorded as not third-party owned. Ownership types recorded: PPA 739, lease 88, prepaid lease 1, other 8.
Installers by installs in 95361
Installers with a page in this index, most installs in this ZIP first. 214 such installers have at least one install here. 191 more installs were by 100 installer names without a page in this index. 111 were self-installed or had no installer recorded. Counts of connected systems, not a rating.
| Installer | Installs in 95361 | Last 24 months |
|---|---|---|
| SIG SOLAR, S.I.G. | 523 | 113 |
| Sunrun | 289 | 99 |
| Tesla Energy Operations (formerly SolarCity) | 267 | 8 |
| Vivint Solar Developer, LLC | 242 | 0 |
| 1st Light Energy Inc | 141 | 4 |
| Sunlectric | 124 | 6 |
| SOLAR INSTALLATION GROUP, INC. | 119 | 0 |
| Mid-State Solar | 96 | 7 |
| WESTERN VALLEY DEVELOPMENT INC | 61 | 4 |
| Honeys Air and Solar | 55 | 0 |
City and county recorded for 95361
The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.
| Recorded as | Installs |
|---|---|
| City: Oakdale | 3,384 |
| County: Stanislaus County | 3,385 |
5 other city values on 26 installs; 1 other county on 25 installs, each under 1% of this ZIP’s installs, are not listed.
Common questions
How common are home batteries with solar in 95361?
14.5% of the residential solar installs here include battery storage across all years (494 of 3,410). In the last 24 months the share was 72.0% (322 of 447).
How many solar installs in 95361 are under NEM 3.0?
502 of the 3,410 installs here with a tariff recorded (14.7%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.
Which solar installers have the most installs in 95361?
Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: SIG SOLAR, S.I.G. (523), Sunrun (289), Tesla Energy Operations (formerly SolarCity) (267). These are counts of connected systems, not a rating of price, workmanship or service.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.