Honeys Air and Solar

How many solar installs has Honeys Air and Solar done in California, and which license number is on its installs?

Honeys Air and Solar has 392 residential solar installs interconnected in California, active in the records from 2012 through 2026 (Jun 20, 2012 to Feb 10, 2026), most of them in San Joaquin County (247), Stanislaus County (80) and Merced County (23). CSLB lists license 942829 (HONEYS AIR & SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-17, C-20, C-36, C-46, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
392
Last 24 months
8
Total capacity
2,283.2 kW DC
Median system size
5.3 kW DC
With battery storage
1.8% all time; 37.5% last 24 months
Third-party owned
0.0% of 392 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
17 installs, latest Feb 10, 2026
Ownership types recorded
none recorded
First install
Jun 20, 2012
Latest install
Feb 10, 2026
Counties
10
Utilities
PGE 392
CSLB license
942829

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201250
201390
2014220
2015780
2016690
2017660
2018440
2019300
202000
202100
202200
2023471
2024163
202521
2026 (through Aug 31, 2026)42

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

17 of its 392 interconnected installs (4.3% of the 392 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 35.3% of those include battery storage. The latest Net Billing Tariff install was approved Feb 10, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.018346.7%not counted
NEM 2.019249.0%1 (0.5%)
Net Billing Tariff174.3%6 (35.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Honeys Air and Solar’s installs. No residential system in the file lists a third-party owner name that matches Honeys Air and Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 8 of Honeys Air and Solar’s 8 installs name a module maker in the “Generator Manufacturer” fields, and most of those (8, 100.0%) used modules recorded as Qcells.

In the last 24 months, 8 of Honeys Air and Solar’s 8 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (8, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 3 of Honeys Air and Solar’s 8 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used batteries recorded as FranklinWH.

6 of 7 battery-paired PG&E and SCE installs (85.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells831
Inverter makerEnphase8201
FranklinWH34
Battery makerFranklinWH34

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 376 of 392 installs, inverters on 392. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
942829HONEYS AIR & SOLAR (Corporation)CLEARC-10 Electrical Contractor; C-17; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-46 Solar ContractorJan 29, 2010Jan 31, 2028368

License numbers are the ones the utilities recorded on the interconnection applications (370 of 392 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 942829. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
San Joaquin247
Stanislaus80
Merced23
Calaveras12
Alameda11
Contra Costa11
Tuolumne5
Lake1
Madera1
Mariposa1

Top cities

CityInstalls
Tracy71
Stockton62
Oakdale55
Manteca54
Ripon23
Riverbank19
Lathrop13
Escalon9
Merced9
Livermore6
Lodi6
Newman6
Atwater5
Valley Springs5
Brentwood4

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HONEYS AIR & SOLAR198
Honeys Air and Solar128
Honeys Air & Solar63
Honeys Air And Solar1
HONEYS AIR AND SOLAR1
HONEYS AIR& SOLAR1

Common questions

Where does Honeys Air and Solar install solar?

Its installs are spread across 10 counties. The most are in San Joaquin County (247 installs), followed by Stanislaus County (80).

How often does Honeys Air and Solar install batteries with solar?

1.8% of its interconnected solar installs include battery storage across all years, and 37.5% in the last 24 months (3 of 8).

How many Honeys Air and Solar installs are under NEM 3.0 (the Net Billing Tariff)?

17 of its 392 interconnected installs (4.3% of the 392 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 35.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.