How many solar installs has Mid-State Solar done in California, and which license number is on its installs?

Mid-State Solar has 291 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Feb 26, 2010 to Aug 24, 2026), most of them in San Joaquin County (151), Stanislaus County (110) and Merced County (20). CSLB lists license 370265 (MID - STATE SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-36, C-46, D-35, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
291
Last 24 months
32
Total capacity
2,782.6 kW DC
Median system size
8.7 kW DC
With battery storage
8.9% all time; 65.6% last 24 months
Third-party owned
0.0% of 291 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
30 installs, latest Aug 24, 2026
Ownership types recorded
none recorded
First install
Feb 26, 2010
Latest install
Aug 24, 2026
Counties
8
Utilities
PGE 291
CSLB license
370265

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201040
2011100
201240
2013100
2014110
2015170
2016130
2017170
2018210
2019310
2020290
2021180
2022311
2023381
2024149
2025149
2026 (through Aug 31, 2026)96

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

30 of its 291 interconnected installs (10.3% of the 291 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 76.7% of those include battery storage. The latest Net Billing Tariff install was approved Aug 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.07124.4%not counted
NEM 2.019065.3%2 (1.1%)
Net Billing Tariff3010.3%23 (76.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Mid-State Solar’s installs. No residential system in the file lists a third-party owner name that matches Mid-State Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 32 of Mid-State Solar’s 32 installs name a module maker in the “Generator Manufacturer” fields, and most of those (23, 71.9%) used modules recorded as Qcells.

In the last 24 months, 32 of Mid-State Solar’s 32 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (32, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 21 of Mid-State Solar’s 32 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (20, 95.2%) used batteries recorded as Enphase.

26 of 26 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells23147
Mission Solar6not in top list
Canadian Solar136
REC1not in top list
SunPower1not in top list
Inverter makerEnphase32224
FranklinWH11
SunPower1not in top list
Battery makerEnphase2025
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 288 of 291 installs, inverters on 291. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
370265MID - STATE SOLAR (Corporation)CLEARC-36; C-46 Solar Contractor; D-35Feb 27, 1979Feb 28, 2027259

License numbers are the ones the utilities recorded on the interconnection applications (259 of 291 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 370265. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Joaquin151
Stanislaus110
Merced20
Calaveras4
Amador3
Fresno1
Mariposa1
Tuolumne1

Top cities

CityInstalls
Oakdale95
Ripon39
Escalon33
Stockton27
Manteca16
Riverbank14
Tracy12
Atwater6
Acampo5
Gustine5
Los Banos5
Galt4
Lathrop4
Lodi4
Farmington3

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MID - STATE SOLAR162
Mid-State Solar127
Mid State Solar1
Mid- State Solar1

Common questions

Where does Mid-State Solar install solar?

Its installs are spread across 8 counties. The most are in San Joaquin County (151 installs), followed by Stanislaus County (110).

How often does Mid-State Solar install batteries with solar?

8.9% of its interconnected solar installs include battery storage across all years, and 65.6% in the last 24 months (21 of 32).

How many Mid-State Solar installs are under NEM 3.0 (the Net Billing Tariff)?

30 of its 291 interconnected installs (10.3% of the 291 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 76.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.