Masellis Electric & Solar, Inc.

How many solar installs has Masellis Electric & Solar, Inc. done in California, and which license number is on its installs?

Masellis Electric & Solar, Inc. has 154 residential solar installs interconnected in California, active in the records from 2011 through 2026 (May 27, 2011 to Apr 6, 2026), most of them in San Joaquin County (91), Stanislaus County (56) and Calaveras County (3). CSLB lists license 299990 (MASELLIS ELECTRIC & SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-27, C-46, expires Nov 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
154
Last 24 months
15
Total capacity
1,792.5 kW DC
Median system size
10.4 kW DC
With battery storage
3.2% all time; 33.3% last 24 months
Third-party owned
0.0% of 154 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
6 installs, latest Jan 2, 2026
Ownership types recorded
none recorded
First install
May 27, 2011
Latest install
Apr 6, 2026
Counties
6
Utilities
PGE 154
CSLB license
299990

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201110
201220
201330
201490
2015170
2016130
201760
2018100
2019160
202080
2021190
2022150
2023160
202461
202583
2026 (through Aug 31, 2026)51

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

6 of its 154 interconnected installs (3.9% of the 154 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The latest Net Billing Tariff install was approved Jan 2, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04629.9%not counted
NEM 2.010266.2%0 (0.0%)
Net Billing Tariff63.9%5 (83.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Masellis Electric & Solar, Inc.’s installs. No residential system in the file lists a third-party owner name that matches Masellis Electric & Solar, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 7 of Masellis Electric & Solar, Inc.’s 15 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 71.4%) used modules recorded as Trina Solar.

In the last 24 months, 15 of Masellis Electric & Solar, Inc.’s 15 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (13, 86.7%) used inverters recorded as Enphase.

In the last 24 months, 5 of Masellis Electric & Solar, Inc.’s 15 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used batteries recorded as Enphase.

5 of 5 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTrina Solar5not in top list
Qcells216
Inverter makerEnphase13122
SMA614
Fronius221
Battery makerEnphase55

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 144 of 154 installs, inverters on 154. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
299990MASELLIS ELECTRIC & SOLAR INC (Corporation)CLEARC-10 Electrical Contractor; C-27; C-46 Solar ContractorNov 20, 1974Nov 30, 2028143

License numbers are the ones the utilities recorded on the interconnection applications (144 of 154 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 299990. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Joaquin91
Stanislaus56
Calaveras3
Merced2
Mariposa1
Tuolumne1

Top cities

CityInstalls
Oakdale45
Escalon41
Ripon13
Tracy11
Stockton10
Riverbank7
Linden5
Manteca5
Clements2
Farmington2
Acampo1
Angels Camp1
Ballico1
Copperopolis1
Coulterville1

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MASELLIS ELECTRIC & SOLAR INC77
Masellis Electric & Solar, Inc.65
Masellis Electric & Solar Inc.3
Masellis Electric & Solar, Inc3
Masellis Electric & Solar2
Masellis Electric & Solar Inc2
masellis Electric & Solar, Inc1
Masellis Electric & Solar, inc.1

Common questions

Where does Masellis Electric & Solar, Inc. install solar?

Its installs are spread across 6 counties. The most are in San Joaquin County (91 installs), followed by Stanislaus County (56).

How often does Masellis Electric & Solar, Inc. install batteries with solar?

3.2% of its interconnected solar installs include battery storage across all years, and 33.3% in the last 24 months (5 of 15).

How many Masellis Electric & Solar, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

6 of its 154 interconnected installs (3.9% of the 154 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.