LUMIO HX INC

How many solar installs has LUMIO HX INC done in California, and which license number is on its installs?

LUMIO HX INC has 195 residential solar installs interconnected in California, active in the records from 2023 through 2025 (Jun 26, 2023 to Oct 27, 2025), most of them in Tulare County (69), Kern County (47) and San Bernardino County (20). The license number recorded on most of its installs, 1097040, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
195
Last 24 months
25
Total capacity
1,073.9 kW DC
Median system size
4.1 kW DC
With battery storage
11.8% all time; 40.0% last 24 months
Third-party owned
16.9% of 195 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
174 installs, latest Oct 27, 2025
Ownership types recorded
PPA 32, lease 1
Median battery size
9.9 kWh (22 installs list a capacity)
First install
Jun 26, 2023
Latest install
Oct 27, 2025
Counties
16
Utilities
SCE 131, PGE 64
CSLB license
1097040

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
2023891
20249815
202587
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

174 of its 195 interconnected installs (89.2% of the 195 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 13.2% of those include battery storage. The latest Net Billing Tariff install was approved Oct 27, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.02110.8%0 (0.0%)
Net Billing Tariff17489.2%23 (13.2%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 33 of LUMIO HX INC’s installs the utility recorded a third-party ownership type: PPA 32, lease 1, prepaid lease 0, other 0. Across all installers, 2 residential systems list a third-party owner name that matches LUMIO HX INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunnova17
Lumio12
Solkraft3
Palmetto-LightReach1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 25 of LUMIO HX INC’s 25 installs name a module maker in the “Generator Manufacturer” fields, and most of those (18, 72.0%) used modules recorded as Qcells.

In the last 24 months, 25 of LUMIO HX INC’s 25 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (24, 96.0%) used inverters recorded as Enphase.

In the last 24 months, 9 of LUMIO HX INC’s 25 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (8, 88.9%) used batteries recorded as Enphase.

21 of 23 battery-paired PG&E and SCE installs (91.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells18182
JinkoSolar77
Enphase1not in top list
SunPower13
Inverter makerEnphase24133
SolarEdge151
Battery makerEnphase811
SolarEdge110

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 192 of 195 installs, inverters on 195. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1097040Not found in the CSLB License Master file pulled Nov 4, 2026195

License numbers are the ones the utilities recorded on the interconnection applications (195 of 195 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list LUMIO HX INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202220232024Total
City and County of San Francisco1097040010111
unincorporated San Diego County1097040810119

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Tulare69
Kern47
San Bernardino20
Los Angeles12
Contra Costa10
Orange9
Riverside6
Fresno5
Kings4
Solano4
San Joaquin3
Ventura2
Alameda1
Madera1
Napa1
San Francisco1

Top cities

CityInstalls
Tulare47
Bakersfield38
Visalia15
Tehachapi6
Victorville5
Porterville4
Carson3
Hanford3
Orange3
Richmond3
Apple Valley2
Arcadia2
Chino2
Concord2
Fresno2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LUMIO HX INC193
LUMIO-HX-INC2

Common questions

Where does LUMIO HX INC install solar?

Its installs are spread across 16 counties. The most are in Tulare County (69 installs), followed by Kern County (47).

How often does LUMIO HX INC install batteries with solar?

11.8% of its interconnected solar installs include battery storage across all years, and 40.0% in the last 24 months (10 of 25).

How many LUMIO HX INC installs are under NEM 3.0 (the Net Billing Tariff)?

174 of its 195 interconnected installs (89.2% of the 195 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 13.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.