Lift Energy Inc

How many solar installs has Lift Energy Inc done in California, and which license number is on its installs?

Lift Energy Inc has 213 residential solar installs interconnected in California, active in the records from 2019 through 2024 (Sep 11, 2019 to Oct 15, 2024), most of them in San Diego County (180), Orange County (29) and Kern County (4). The license number recorded on most of its installs, 1030273, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
213
Last 24 months
2
Total capacity
1,408.9 kW DC
Median system size
5.9 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
4.7% of 213 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
27 installs, latest Jul 29, 2024
Ownership types recorded
PPA 10
First install
Sep 11, 2019
Latest install
Oct 15, 2024
Counties
3
Utilities
SDGE 209, PGE 4
CSLB license
1030273, 1097040

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201940
202000
202100
2022550
20231180
2024360
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

27 of its 213 interconnected installs (12.7% of the 213 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Jul 29, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.018687.3%0 (0.0%)
Net Billing Tariff2712.7%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 10 of Lift Energy Inc’s installs the utility recorded a third-party ownership type: PPA 10, lease 0, prepaid lease 0, other 0. Across all installers, 22 residential systems list a third-party owner name that matches Lift Energy Inc exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Lift Energy Inc5
sunnova3
Lumio2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of Lift Energy Inc’s 2 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used modules recorded as Qcells.

In the last 24 months, 2 of Lift Energy Inc’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2188
Inverter makerEnphase2199

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 190 of 213 installs, inverters on 213. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1030273Not found in the CSLB License Master file pulled Nov 4, 2026184
1097040Not found in the CSLB License Master file pulled Nov 4, 202629

License numbers are the ones the utilities recorded on the interconnection applications (213 of 213 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Lift Energy Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192020202120222023Total
City and County of San Francisco1030273000303
unincorporated San Diego County103027393231711144
unincorporated Marin County1030273001001

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego180
Orange29
Kern4

Top cities

CityInstalls
Santee31
San Diego30
Oceanside19
Vista16
Escondido15
Dana Point11
Julian10
Chula Vista8
La Mesa8
San Clemente7
Carlsbad5
Fallbrook5
Mission Viejo5
El Cajon4
Ladera Ranch4

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LIFT ENERGY INC176
Lift Energy Inc33
Lift Energy4

Common questions

Where does Lift Energy Inc install solar?

Its installs are spread across 3 counties. The most are in San Diego County (180 installs), followed by Orange County (29).

How often does Lift Energy Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Lift Energy Inc installs are under NEM 3.0 (the Net Billing Tariff)?

27 of its 213 interconnected installs (12.7% of the 213 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.