LIFT ENERGY CONSTRUCTION INC has 7,342 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Aug 27, 2019 to Jul 21, 2026), most of them in Kern County (1,805), San Bernardino County (961) and Fresno County (839). The license number recorded on most of its installs, 1030273, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
7,342
Last 24 months
21
Total capacity
56,933.9 kW DC
Median system size
7.2 kW DC
With battery storage
0.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 4.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
30.0% of 7,342 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
12 installs, latest Mar 21, 2024
Ownership types recorded
PPA 2,186, lease 15
Median battery size
13.5 kWh (14 installs list a capacity)
First install
Aug 27, 2019
Latest install
Jul 21, 2026
Counties
42
Utilities
PGE 3,538, SCE 3,479, SDGE 325
CSLB license
1030273

Is LIFT ENERGY CONSTRUCTION INC still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (8 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
20191330
20207050
20212,2786
20222,5066
20231,5153
20241902
202581
2026 (through Aug 31, 2026)70

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

12 of its 7,342 interconnected installs (0.2% of the 7,342 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Mar 21, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.07,33099.8%18 (0.3%)
Net Billing Tariff120.2%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 2,201 of LIFT ENERGY CONSTRUCTION INC’s installs the utility recorded a third-party ownership type: PPA 2,186, lease 15, prepaid lease 0, other 0. Across all installers, 178 residential systems list a third-party owner name that matches LIFT ENERGY CONSTRUCTION INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunnova1,437
Solkraft406
LIFT ENERGY CONSTRUCTION INC178
Sunrun92
Lumio34

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 21 of LIFT ENERGY CONSTRUCTION INC’s 21 installs name a module maker in the “Generator Manufacturer” fields, and most of those (18, 85.7%) used modules recorded as Qcells.

In the last 24 months, 21 of LIFT ENERGY CONSTRUCTION INC’s 21 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (18, 85.7%) used inverters recorded as Enphase.

In the last 24 months, 1 of LIFT ENERGY CONSTRUCTION INC’s 21 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

15 of 18 battery-paired PG&E and SCE installs (83.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells183,012
AU Optronics1not in top list
Canadian Solar12,720
JA Solar1not in top list
LONGi1316
Inverter makerEnphase185,324
SolarEdge21,523
SunPower1491
Battery makerEnphase12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 6,223 of 7,342 installs, inverters on 7,342. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1030273Not found in the CSLB License Master file pulled Nov 4, 20267,341

License numbers are the ones the utilities recorded on the interconnection applications (7,342 of 7,342 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list LIFT ENERGY CONSTRUCTION INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20192020202120222023Total
City and County of San Francisco1030273000303
unincorporated San Diego County103027393231711144
unincorporated Marin County1030273001001

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Kern1,805
San Bernardino961
Fresno839
Tulare569
Riverside512
Orange467
Los Angeles441
San Joaquin313
San Diego294
Ventura220
Contra Costa209
Kings188
Solano178
Madera88
Stanislaus66
Merced24
Santa Clara24
Alameda19
El Dorado17
Yolo14
San Francisco13
San Benito12
San Mateo10
Napa9
San Luis Obispo9
Santa Barbara7
Calaveras5
Monterey5
Sonoma4
Placer3
Lake2
Marin2
Mendocino2
Santa Cruz2
Sutter2
Amador1
Butte1
Inyo1
Mariposa1
Tehama1
Tuolumne1
Yuba1

Top cities

CityInstalls
Bakersfield1,317
Fresno468
Visalia277
Victorville193
Fontana126
Tulare121
Clovis120
Hanford120
Stockton118
Manteca112
Tehachapi108
Apple Valley99
Rialto95
Hemet89
Huntington Beach86

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LIFT ENERGY CONSTRUCTION INC6,973
Lift Energy Construction Inc363
Lift Energy Construction Inc.4
Lift Energy Construction inc.2

Common questions

Where does LIFT ENERGY CONSTRUCTION INC install solar?

Its installs are spread across 42 counties. The most are in Kern County (1,805 installs), followed by San Bernardino County (961).

How often does LIFT ENERGY CONSTRUCTION INC install batteries with solar?

0.3% of its interconnected solar installs include battery storage across all years, and 4.8% in the last 24 months (1 of 21). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many LIFT ENERGY CONSTRUCTION INC installs are under NEM 3.0 (the Net Billing Tariff)?

12 of its 7,342 interconnected installs (0.2% of the 7,342 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.