Solar installers in Chino, California
Most installs here are in San Bernardino County.
Who installs the most solar in Chino?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Chino are Sunrun (582), SunPower (141) and LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC (63). They account for 786 of the 1,244 residential solar installs interconnected there in that window.
In all, 8,072 homes in Chino have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 114 installers with installs in this window. 7 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | SunPower | 1,388 | 1,388 |
| 2 | Sunrun | 1,234 | 1,234 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 720 | 720 |
| 4 | SunStreet Energy Group LLC | 701 | 701 |
| 5 | Vivint Solar Developer, LLC | 395 | 395 |
| 6 | SUNNOVA ENERGY CORPORATION | 250 | 250 |
| 7 | FREEDOM FOREVER LLC | 146 | 146 |
| 8 | SolarMax Renewable Energy Provider, Inc | 118 | 118 |
| 9 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 107 | 107 |
| 10 | Bright Planet Solar | 98 | 98 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 1,077 | 61 |
| 2023 | 1,024 | 110 |
| 2024 | 517 | 264 |
| 2025 | 670 | 260 |
| 2026 (through Aug 31, 2026) | 431 | 200 |
Under the Net Billing Tariff (NEM 3.0)
1,356 of the 8,072 residential solar installs in Chino (16.8% of the 8,072 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 52.4% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Chino
| 1 | Sunrun | 596 | 232 | 38.9% |
| 2 | SunPower | 118 | 11 | 9.3% |
| 3 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 65 | 19 | 29.2% |
| 4 | BRIGHT OPS | 58 | 50 | 86.2% |
| 5 | Tesla Energy Operations (formerly SolarCity) | 51 | 47 | 92.2% |
| 6 | FREEDOM FOREVER LLC | 33 | 31 | 93.9% |
| 7 | V3 Electric | 30 | 30 | 100.0% |
| 8 | BETTER EARTH ELECTRIC INC | 26 | 20 | 76.9% |
| 9 | SolarMax Renewable Energy Provider, Inc | 23 | 21 | 91.3% |
| 10 | SUNNOVA ENERGY CORPORATION | 22 | 22 | 100.0% |
| 11 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 16 | 15 | 93.8% |
| 12 | Current Home | 14 | 14 | 100.0% |
| 13 | TITANIUM SOLAR LLC | 13 | 6 | 46.2% |
| 14 | Bright Planet Solar | 11 | 0 | 0.0% |
| 15 | Empower Electric Solar | 9 | 9 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 1,189 of Chino’s 1,244 installs name a module maker in the “Generator Manufacturer” fields, and most of those (614, 51.6%) used modules recorded as Qcells.
In the last 24 months, 1,244 of Chino’s 1,244 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (748, 60.1%) used inverters recorded as Enphase.
In the last 24 months, 546 of Chino’s 1,244 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (338, 61.9%) used batteries recorded as Tesla.
967 of 995 battery-paired PG&E and SCE installs (97.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 614 | 1,863 |
| JA Solar | 251 | 440 | |
| LONGi | 104 | 449 | |
| Silfab | 45 | not in top list | |
| Canadian Solar | 42 | 317 | |
| Inverter maker | Enphase | 748 | 3,280 |
| Tesla | 298 | 437 | |
| SolarEdge | 201 | 2,366 | |
| Delta Electronics | 13 | 125 | |
| ABB | 11 | 421 | |
| Battery maker | Tesla | 338 | 529 |
| Enphase | 106 | 160 | |
| SolarEdge | 72 | 136 | |
| LG | 11 | 88 | |
| FranklinWH | 10 | 13 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 7,040 of 8,072 installs, inverters on 8,070. See the methodology and the equipment index.
ZIP codes in Chino
ZIP codes with their own page where the utilities recorded Chino on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Chino
The SGIP report lists 186 battery storage projects with the city Chino, 98 with the status Paid ($3,782,211 in current incentive allocations, 6,840 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 98 | 6,840 | $3,782,211 |
| PBI in Process | 1 | 2,537 | $346,950 |
| Reserved | 30 | 3,484 | $1,182,434 |
| Pending Reservation | 4 | 53 | $125,820 |
| Waitlist | 18 | 258 | $420,753 |
| Cancelled | 32 | 2,709 | $2,545,802 |
| RRF Rejected | 3 | 36 | $6,060 |
Installers named on the most SGIP storage projects in Chino
27 of the 186 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Chino is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 8,072
- Last 24 months
- 1,244
- Capacity
- 46.6 MW DC
- Median system size
- 4.8 kW DC
- With battery storage
- 12.3% all time; 44.7% last 24 months
- Third-party owned
- 50.9% where reported
- Ownership types recorded
- PPA 2,785, lease 949, prepaid lease 9, other 108
- Median battery size
- 13.5 kWh
- Earliest install in data
- Nov 20, 2001
Common questions
How many homes in Chino have solar?
8,072 residential solar systems in Chino were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 1,244 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Chino?
114 installer names have at least one install interconnected in Chino in the last 24 months, and 545 appear in the full record.
How common are batteries with new solar in Chino?
12.3% of the solar installs interconnected in Chino include battery storage across all years, and 44.7% in the last 24 months (556 of 1,244).
How many solar installs in Chino are under NEM 3.0?
1,356 of the 8,072 residential solar installs in Chino (16.8% of the 8,072 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 52.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.