ALTSYS SOLAR INC

How many solar installs has ALTSYS SOLAR INC done in California, and which license number is on its installs?

ALTSYS SOLAR INC has 473 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Sep 3, 2010 to Aug 20, 2026), most of them in Tulare County (349), Kings County (55) and Fresno County (41). CSLB lists license 944549 (ALTSYS SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
473
Last 24 months
69
Total capacity
4,403.9 kW DC
Median system size
8.2 kW DC
With battery storage
8.7% all time; 46.4% last 24 months
Third-party owned
2.2% of 465 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
75 installs, latest Aug 20, 2026
Ownership types recorded
PPA 2, lease 8
Median battery size
14.3 kWh (40 installs list a capacity)
First install
Sep 3, 2010
Latest install
Aug 20, 2026
Counties
9
Utilities
SCE 361, PGE 112
CSLB license
944549

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201020
201110
2012120
2013150
2014160
2015220
2016330
2017290
2018401
2019335
2020331
2021300
2022580
2023622
2024251
20253721
2026 (through Aug 31, 2026)2510

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

75 of its 473 interconnected installs (15.9% of the 473 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 42.7% of those include battery storage. The latest Net Billing Tariff install was approved Aug 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011424.1%not counted
NEM 2.028460.0%9 (3.2%)
Net Billing Tariff7515.9%32 (42.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 10 of ALTSYS SOLAR INC’s installs the utility recorded a third-party ownership type: PPA 2, lease 8, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches ALTSYS SOLAR INC exactly.

Third-party owner named on its installsInstalls
Lifestyle Energy Financial, LLC3
GreenPACE Capital2
GreenPACE Financial1
Hibridhome1
Lifestyle Energy1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 69 of ALTSYS SOLAR INC’s 69 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (28, 40.6%) used modules recorded as EG4.

In the last 24 months, 69 of ALTSYS SOLAR INC’s 69 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (34, 49.3%) used inverters recorded as EG4.

In the last 24 months, 3 of ALTSYS SOLAR INC’s 69 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used batteries recorded as EG4.

11 of 41 battery-paired PG&E and SCE installs (26.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerEG42828
Qcells27149
JA Solar10not in top list
Solar4America Technology Inc.9not in top list
Hyundai7not in top list
Inverter makerEG43434
Enphase24121
GoodWe Technologies Co., Ltd.4not in top list
Sol-Ark4not in top list
SolarEdge2178
Battery makerEG422
Enphase12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 427 of 473 installs, inverters on 473. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ALTSYS SOLAR INC as developer on 6 battery storage projects and as installer on 6 (6 name it as both), 6 projects in all with 51 kWh of storage. 4 have the status Paid, with $8,394 in current incentive allocations. Applications were received from Apr 12, 2019 to Feb 13, 2020.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid434$8,394
Cancelled217$4,673

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage651$13,0674$8,394

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
944549ALTSYS SOLAR INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorMar 17, 2010Mar 31, 2028465

License numbers are the ones the utilities recorded on the interconnection applications (465 of 473 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 944549. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Tulare349
Kings55
Fresno41
San Luis Obispo11
Kern9
Los Angeles3
Madera3
San Bernardino1
San Joaquin1

Top cities

CityInstalls
Tulare109
Visalia100
Porterville32
Lemoore31
Exeter23
Hanford21
Woodlake21
Three Rivers16
Springville13
Fresno9
Bakersfield8
Reedley7
Selma7
Strathmore7
Clovis6

Names as recorded by the utilities

The utilities recorded this installer under 12 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ALTSYS SOLAR INC353
AltSys Solar Inc40
Altsys Solar, Inc.24
Altsys Solar Inc19
Altsys Solar Inc.19
AltSys Solar, Inc.5
Altsys Solar, Inc4
AltSys Solar Inc.2
ALTSYS SOLAR INC.2
AltSys Solar, Inc2
ALTSYS SOLAR, INC.2
Altsys solar, inc1

Common questions

Where does ALTSYS SOLAR INC install solar?

Its installs are spread across 9 counties. The most are in Tulare County (349 installs), followed by Kings County (55).

How often does ALTSYS SOLAR INC install batteries with solar?

8.7% of its interconnected solar installs include battery storage across all years, and 46.4% in the last 24 months (32 of 69).

How many ALTSYS SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

75 of its 473 interconnected installs (15.9% of the 473 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 42.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.