JP ELECTRICAL SOLAR INC has 685 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Feb 7, 2018 to Jan 7, 2026), most of them in Tulare County (641), Kings County (41) and Kern County (3). CSLB lists license 1026918 (J P ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
685
Last 24 months
44
Total capacity
6,656.9 kW DC
Median system size
9.2 kW DC
With battery storage
10.8% all time; 75.0% last 24 months
Third-party owned
13.1% of 685 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
84 installs, latest Jan 7, 2026
Ownership types recorded
PPA 73, lease 17
Median battery size
13.5 kWh (74 installs list a capacity)
First install
Feb 7, 2018
Latest install
Jan 7, 2026
Counties
3
Utilities
SCE 685
CSLB license
1026918

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018520
2019650
2020710
2021610
20221423
20232095
20245646
20252719
2026 (through Aug 31, 2026)21

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

84 of its 685 interconnected installs (12.3% of the 685 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 79.8% of those include battery storage. The latest Net Billing Tariff install was approved Jan 7, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.060187.7%7 (1.2%)
Net Billing Tariff8412.3%67 (79.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 90 of JP ELECTRICAL SOLAR INC’s installs the utility recorded a third-party ownership type: PPA 73, lease 17, prepaid lease 0, other 0. Across all installers, 8 residential systems list a third-party owner name that matches JP ELECTRICAL SOLAR INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SUNPOWER57
Lightreach12
JP ELECTRICAL SOLAR INC8
Sunpower Financing7
Lightreach Palmetto2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 44 of JP ELECTRICAL SOLAR INC’s 44 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (14, 31.8%) used modules recorded as LONGi.

In the last 24 months, 44 of JP ELECTRICAL SOLAR INC’s 44 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (39, 88.6%) used inverters recorded as Enphase.

In the last 24 months, 33 of JP ELECTRICAL SOLAR INC’s 44 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (13, 39.4%) used batteries recorded as Tesla.

71 of 74 battery-paired PG&E and SCE installs (95.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi1414
Waaree10114
Qcells736
JA Solar6not in top list
SunPower5476
Inverter makerEnphase39239
SunPower4261
Tesla116
Battery makerTesla1313
Enphase1010
SunPower947
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 660 of 685 installs, inverters on 685. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1026918J P ELECTRIC (Corporation)CLEARC-10 Electrical ContractorMay 16, 2017May 31, 2027685

License numbers are the ones the utilities recorded on the interconnection applications (685 of 685 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1026918. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Tulare641
Kings41
Kern3

Top cities

CityInstalls
Visalia402
Tulare104
Exeter53
Hanford41
Porterville37
Woodlake12
Three Rivers9
Lindsay7
Springville6
Delano3
Farmersville3
Ivanhoe3
Terra Bella3
Lemon Cove1
Tipton1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
JP ELECTRICAL SOLAR INC685

Common questions

Where does JP ELECTRICAL SOLAR INC install solar?

Its installs are spread across 3 counties. The most are in Tulare County (641 installs), followed by Kings County (41).

How often does JP ELECTRICAL SOLAR INC install batteries with solar?

10.8% of its interconnected solar installs include battery storage across all years, and 75.0% in the last 24 months (33 of 44).

How many JP ELECTRICAL SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

84 of its 685 interconnected installs (12.3% of the 685 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 79.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.