J P ELECTRICAL SOLAR INC

How many solar installs has J P ELECTRICAL SOLAR INC done in California, and which license number is on its installs?

J P ELECTRICAL SOLAR INC has 230 residential solar installs interconnected in California, active in the records from 2019 through 2025 (Oct 18, 2019 to Dec 22, 2025), most of them in Fresno County (76), Tulare County (61) and San Luis Obispo County (48). CSLB lists license 1026918 (J P ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
230
Last 24 months
5
Total capacity
1,847.7 kW DC
Median system size
7.4 kW DC
With battery storage
6.5% all time; 80.0% last 24 months
Third-party owned
7.8% of 230 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
15 installs, latest Dec 22, 2025
Ownership types recorded
PPA 8, lease 9, other 1
First install
Oct 18, 2019
Latest install
Dec 22, 2025
Counties
7
Utilities
PGE 188, SCE 42
CSLB license
1026918

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019110
2020620
2021721
2022282
2023390
2024138
202554
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

15 of its 230 interconnected installs (6.5% of the 230 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 22, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.021593.5%3 (1.4%)
Net Billing Tariff156.5%12 (80.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 18 of J P ELECTRICAL SOLAR INC’s installs the utility recorded a third-party ownership type: PPA 8, lease 9, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches J P ELECTRICAL SOLAR INC exactly.

Third-party owner named on its installsInstalls
SunPower15
Lightreach2
Mosaic1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of J P ELECTRICAL SOLAR INC’s 5 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 50.0%) used modules recorded as Waaree.

In the last 24 months, 5 of J P ELECTRICAL SOLAR INC’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 3 of J P ELECTRICAL SOLAR INC’s 5 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used batteries recorded as Tesla.

14 of 15 battery-paired PG&E and SCE installs (93.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerWaaree223
JA Solar11
LONGi11
Inverter makerEnphase543
Tesla35
SunPower1171
Battery makerTesla22
SunPower112

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 222 of 230 installs, inverters on 230. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1026918J P ELECTRIC (Corporation)CLEARC-10 Electrical ContractorMay 16, 2017May 31, 2027230

License numbers are the ones the utilities recorded on the interconnection applications (230 of 230 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1026918. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Fresno76
Tulare61
San Luis Obispo48
Kings23
Santa Barbara11
Madera9
Kern2

Top cities

CityInstalls
Visalia27
Clovis24
Fresno24
Lemoore17
Nipomo12
Kingsburg11
Dinuba10
Santa Maria10
Arroyo Grande8
Madera7
Paso Robles7
San Luis Obispo7
Reedley6
Tulare5
Woodlake5

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
J P ELECTRICAL SOLAR INC230

Common questions

Where does J P ELECTRICAL SOLAR INC install solar?

Its installs are spread across 7 counties. The most are in Fresno County (76 installs), followed by Tulare County (61).

How often does J P ELECTRICAL SOLAR INC install batteries with solar?

6.5% of its interconnected solar installs include battery storage across all years, and 80.0% in the last 24 months (4 of 5).

How many J P ELECTRICAL SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

15 of its 230 interconnected installs (6.5% of the 230 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.