BRATTON SOLAR INC

How many solar installs has BRATTON SOLAR INC done in California, and which license number is on its installs?

BRATTON SOLAR INC has 415 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Dec 11, 2015 to Aug 27, 2026), most of them in Tulare County (167), Fresno County (136) and Madera County (31). CSLB lists license 981116 (BRATTON SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
415
Last 24 months
153
Total capacity
3,133.7 kW DC
Median system size
6.1 kW DC
With battery storage
21.2% all time; 55.6% last 24 months
Third-party owned
0.0% of 415 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
151 installs, latest Aug 27, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (87 installs list a capacity)
First install
Dec 11, 2015
Latest install
Aug 27, 2026
Counties
23
Utilities
PGE 244, SCE 171
CSLB license
981116

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201510
2016140
2017830
2018400
2019120
202060
2021302
2022160
2023571
202430
20259071
2026 (through Aug 31, 2026)6314

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

151 of its 415 interconnected installs (36.4% of the 415 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 56.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0235.5%not counted
NEM 2.024158.1%2 (0.8%)
Net Billing Tariff15136.4%85 (56.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on BRATTON SOLAR INC’s installs. No residential system in the file lists a third-party owner name that matches BRATTON SOLAR INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 152 of BRATTON SOLAR INC’s 153 installs name a module maker in the “Generator Manufacturer” fields, and most of those (96, 63.2%) used modules recorded as LONGi.

In the last 24 months, 153 of BRATTON SOLAR INC’s 153 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (113, 73.9%) used inverters recorded as Tesla.

In the last 24 months, 85 of BRATTON SOLAR INC’s 153 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (50, 58.8%) used batteries recorded as Tesla.

87 of 88 battery-paired PG&E and SCE installs (98.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi9698
Hyundai5257
JA Solar3not in top list
Trina Solar1not in top list
Inverter makerTesla113115
SolarEdge35207
Enphase597
Battery makerTesla5050
SolarEdge3434
Enphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 397 of 415 installs, inverters on 415. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
981116BRATTON SOLAR INC (Corporation)CLEARC-46 Solar ContractorFeb 13, 2013Feb 28, 2027414

License numbers are the ones the utilities recorded on the interconnection applications (415 of 415 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 981116. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Tulare167
Fresno136
Madera31
Merced17
Kings15
Tehama10
San Luis Obispo7
San Joaquin6
Shasta5
Butte4
Kern3
Santa Clara3
Glenn1
Lake1
Los Angeles1
Marin1
Mariposa1
Monterey1
Napa1
Solano1
Sonoma1
Stanislaus1
Yolo1

Top cities

CityInstalls
Visalia154
Fresno76
Clovis33
Madera19
Hanford9
Sanger8
Chowchilla7
Merced6
Los Banos5
Coarsegold4
Reedley4
Riverdale4
Anderson3
Atascadero3
Bakersfield3

Names as recorded by the utilities

The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BRATTON SOLAR INC277
BRATTON SOLAR, INC.51
Bratton Solar38
Bratton Solar Inc.28
Bratton Solar, Inc.11
Bratton Solar Inc6
bratton Solar Inc2
bratton solar1
Bratton Solar, Inc1

Common questions

Where does BRATTON SOLAR INC install solar?

Its installs are spread across 23 counties. The most are in Tulare County (167 installs), followed by Fresno County (136).

How often does BRATTON SOLAR INC install batteries with solar?

21.2% of its interconnected solar installs include battery storage across all years, and 55.6% in the last 24 months (85 of 153).

How many BRATTON SOLAR INC installs are under NEM 3.0 (the Net Billing Tariff)?

151 of its 415 interconnected installs (36.4% of the 415 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 56.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.