Solar installers in Rancho Mirage, California
Most installs here are in Riverside County.
Who installs the most solar in Rancho Mirage?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Rancho Mirage are Sunrun (91), Renova Energy Corp (73) and Hot Purple Energy (62). They account for 226 of the 473 residential solar installs interconnected there in that window.
In all, 5,363 homes in Rancho Mirage have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 76 installers with installs in this window. 13 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 91 | 271 |
| 2 | Renova Energy Corp | 73 | 1,760 |
| 3 | Hot Purple Energy | 62 | 295 |
| 4 | SUNLOGIX ENERGY INC | 25 | 154 |
| 5 | SUNLOGIX AC, HEATING , & SOLAR | 18 | 18 |
| 6 | Tesla Energy Operations (formerly SolarCity) | 13 | 608 |
| 7 | SunPower | 11 | 494 |
| 8 | Citadel Roofing and Solar | 9 | 9 |
| 9 | Planet Solar Inc. | 8 | 140 |
| 10 | Current Home | 7 | 16 |
| 11 | FREEDOM FOREVER LLC | 7 | 38 |
| 12 | GOAT SOLAR INC | 7 | 7 |
| 13 | JJ ENERGY INC | 7 | 11 |
| 14 | MICHAEL SANDOVAL LLC DBA SUPREME SOLAR & ELECTRIC | 7 | 7 |
| 15 | SUN CAPITAL ENERGY | 7 | 7 |
| 16 | AXIA SOLAR CORP | 6 | 6 |
| 17 | ZACHARY NOAH GAMEZ | 6 | 12 |
| 18 | BRIGHT OPS | 5 | 6 |
| 19 | ORANGE COUNTY CONTRACTING SERVICES | 5 | 5 |
| 20 | PACIFIC COAST GENERATION INC | 4 | 4 |
| 21 | Powur PBC (Powur Home) | 4 | 11 |
| 22 | VOLTAIC CONSTRUCTION LLC | 4 | 4 |
| 23 | GOGREEN BUILDERS LLC | 3 | 3 |
| 24 | OASIS PARTNERS LLC DBA TIMO SOLAR | 3 | 3 |
| 25 | RANGEL INC | 3 | 3 |
Most installs, all time
| 1 | Renova Energy Corp | 1,760 | 1,760 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 608 | 608 |
| 3 | SunPower | 494 | 494 |
| 4 | Hot Purple Energy | 295 | 295 |
| 5 | Sunrun | 271 | 271 |
| 6 | HelioPower | 156 | 156 |
| 7 | SUNLOGIX ENERGY INC | 154 | 154 |
| 8 | Planet Solar Inc. | 140 | 140 |
| 9 | Horizon Solar Power | 53 | 53 |
| 10 | Verengo | 52 | 52 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 691 | 72 |
| 2023 | 639 | 83 |
| 2024 | 237 | 158 |
| 2025 | 249 | 224 |
| 2026 (through Aug 31, 2026) | 167 | 144 |
Under the Net Billing Tariff (NEM 3.0)
563 of the 5,363 residential solar installs in Rancho Mirage (10.5% of the 5,363 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.8% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Rancho Mirage
| 1 | Renova Energy Corp | 123 | 102 | 82.9% |
| 2 | Sunrun | 102 | 102 | 100.0% |
| 3 | Hot Purple Energy | 44 | 41 | 93.2% |
| 4 | SUNLOGIX ENERGY INC | 34 | 30 | 88.2% |
| 5 | SunPower | 34 | 9 | 26.5% |
| 6 | SUNLOGIX AC, HEATING , & SOLAR | 16 | 14 | 87.5% |
| 7 | Tesla Energy Operations (formerly SolarCity) | 14 | 12 | 85.7% |
| 8 | Citadel Roofing and Solar | 9 | 4 | 44.4% |
| 9 | Planet Solar Inc. | 9 | 8 | 88.9% |
| 10 | FREEDOM FOREVER LLC | 8 | 8 | 100.0% |
| 11 | Current Home | 7 | 7 | 100.0% |
| 12 | GOAT SOLAR INC | 7 | 6 | 85.7% |
| 13 | JJ ENERGY INC | 7 | 7 | 100.0% |
| 14 | MICHAEL SANDOVAL LLC DBA SUPREME SOLAR & ELECTRIC | 7 | 7 | 100.0% |
| 15 | SUN CAPITAL ENERGY | 7 | 7 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 473 of Rancho Mirage’s 473 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (119, 25.2%) used modules recorded as Qcells.
In the last 24 months, 473 of Rancho Mirage’s 473 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (254, 53.7%) used inverters recorded as Tesla.
In the last 24 months, 403 of Rancho Mirage’s 473 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (306, 75.9%) used batteries recorded as Tesla.
818 of 862 battery-paired PG&E and SCE installs (94.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 119 | 587 |
| SunPower | 88 | 2,112 | |
| REC | 52 | 172 | |
| JA Solar | 50 | 106 | |
| LONGi | 41 | 114 | |
| Inverter maker | Tesla | 254 | 353 |
| Enphase | 133 | 1,508 | |
| SolarEdge | 61 | 1,306 | |
| SMA | 19 | 509 | |
| SunPower | 18 | 938 | |
| Battery maker | Tesla | 306 | 537 |
| Enphase | 39 | 54 | |
| FranklinWH | 30 | 32 | |
| SolarEdge | 16 | 29 | |
| SunPower | 7 | 82 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,338 of 5,363 installs, inverters on 5,361. See the methodology and the equipment index.
ZIP codes in Rancho Mirage
ZIP codes with their own page where the utilities recorded Rancho Mirage on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 92270 | 5,356 | 5,361 | 472 |
SGIP battery storage projects in Rancho Mirage
The SGIP report lists 259 battery storage projects with the city Rancho Mirage, 211 with the status Paid ($1,026,268 in current incentive allocations, 4,550 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 211 | 4,550 | $1,026,268 |
| PBI in Process | 1 | 496 | $173,600 |
| Reserved | 2 | 36 | $45,975 |
| Cancelled | 44 | 2,268 | $928,719 |
| RRF Rejected | 1 | 9 | $1,354 |
Installers named on the most SGIP storage projects in Rancho Mirage
7 of the 259 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
At a glance
- Residential solar installs
- 5,363
- Last 24 months
- 473
- Capacity
- 59.7 MW DC
- Median system size
- 9.8 kW DC
- With battery storage
- 16.1% all time; 87.3% last 24 months
- Third-party owned
- 41.4% where reported
- Ownership types recorded
- PPA 481, lease 1,286, prepaid lease 9, other 298
- Median battery size
- 15 kWh
- Earliest install in data
- Jun 18, 2002
Common questions
How many homes in Rancho Mirage have solar?
5,363 residential solar systems in Rancho Mirage were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 473 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Rancho Mirage?
76 installer names have at least one install interconnected in Rancho Mirage in the last 24 months, and 374 appear in the full record.
How common are batteries with new solar in Rancho Mirage?
16.1% of the solar installs interconnected in Rancho Mirage include battery storage across all years, and 87.3% in the last 24 months (413 of 473).
How many solar installs in Rancho Mirage are under NEM 3.0?
563 of the 5,363 residential solar installs in Rancho Mirage (10.5% of the 5,363 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.