Renova Energy Corp

How many solar installs has Renova Energy Corp done in California, and which license number is on its installs?

Renova Energy Corp has 8,735 residential solar installs interconnected in California, active in the records from 2008 through 2026 (May 7, 2008 to Apr 29, 2026), most of them in Riverside County (8,375), San Bernardino County (353) and Orange County (4). The license number recorded on most of its installs, 910836, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
8,735
Last 24 months
440
Total capacity
94,029 kW DC
Median system size
9.9 kW DC
With battery storage
13.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 89.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
44.4% of 8,376 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
720 installs, latest Apr 29, 2026
Ownership types recorded
PPA 69, lease 3,190, other 457
Median battery size
13.5 kWh (1,205 installs list a capacity)
First install
May 7, 2008
Latest install
Apr 29, 2026
Counties
4
Utilities
SCE 8,728, SDGE 7
CSLB license
910836

Is Renova Energy Corp still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (165 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2008 to 2026

YearInstalls interconnectedWith battery storage
200820
200970
2010130
2011120
2012420
20131110
20142210
20154580
20165770
20176897
201873451
201968946
202067282
202193074
20221,311140
20231,418132
2024482341
2025300269
2026 (through Aug 31, 2026)6763

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

720 of its 8,735 interconnected installs (8.2% of the 8,735 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.1% of those include battery storage. The latest Net Billing Tariff install was approved Apr 29, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01,89121.6%not counted
NEM 2.06,12470.1%552 (9.0%)
Net Billing Tariff7208.2%598 (83.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 3,716 of Renova Energy Corp’s installs the utility recorded a third-party ownership type: PPA 69, lease 3,190, prepaid lease 0, other 457. Across all installers, 156 residential systems list a third-party owner name that matches Renova Energy Corp exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower3,343
RENOVA ENERGY CORP156
SunPower Capital, LLC77
EnFin Corp38
SunPower SolarProgram I, LLC34

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 439 of Renova Energy Corp’s 440 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (186, 42.4%) used modules recorded as SunPower.

In the last 24 months, 440 of Renova Energy Corp’s 440 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (269, 61.1%) used inverters recorded as Enphase.

In the last 24 months, 392 of Renova Energy Corp’s 440 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (257, 65.6%) used batteries recorded as Tesla.

1,163 of 1,205 battery-paired PG&E and SCE installs (96.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower1867,361
Qcells112379
Meyer Burger103117
JA Solar3232
Mission Solar1414
Inverter makerEnphase2693,259
Tesla128290
SunPower272,617
FranklinWH15not in top list
SolarEdge101,487
Battery makerTesla257642
FranklinWH104104
SunPower30410
EcoFlow11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 7,930 of 8,735 installs, inverters on 8,735. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Renova Energy Corp as developer on 444 battery storage projects and as installer on 445 (444 name it as both), 445 projects in all with 8,895 kWh of storage. 370 have the status Paid, with $1,760,832 in current incentive allocations. Applications were received from Feb 23, 2016 to Mar 10, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid3707,223$1,760,832
Cancelled731,634$330,038
RRF Rejected238$8,676

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage3736,224$1,409,162321$1,239,445
Large-Scale Storage642,474$533,19544$384,191
Equity Resiliency5145$137,1955$137,195
Not stated352$19,9950$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
910836Not found in the CSLB License Master file pulled Nov 4, 20268,717

License numbers are the ones the utilities recorded on the interconnection applications (8,729 of 8,735 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list Renova Energy Corp’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2019202020212022Total
unincorporated San Diego County91083611114

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside8,375
San Bernardino353
Orange4
San Diego3

Top cities

CityInstalls
Palm Desert2,288
Palm Springs2,101
Rancho Mirage1,760
Cathedral City1,035
Indian Wells651
Desert Hot Springs450
Yucca Valley170
Joshua Tree86
Twentynine Palms50
Beaumont23
Morongo Valley23
Whitewater10
Pioneertown8
Calimesa7
Yucaipa6

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
RENOVA ENERGY CORP4,412
Renova Energy Corp4,262
Renova Energy Corp.60
Renova Energy1

Common questions

Where does Renova Energy Corp install solar?

Its installs are spread across 4 counties. The most are in Riverside County (8,375 installs), followed by San Bernardino County (353).

How often does Renova Energy Corp install batteries with solar?

13.8% of its interconnected solar installs include battery storage across all years, and 89.1% in the last 24 months (392 of 440). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Renova Energy Corp installs are under NEM 3.0 (the Net Billing Tariff)?

720 of its 8,735 interconnected installs (8.2% of the 8,735 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.