Solar installers in Desert Hot Springs, California
Most installs here are in Riverside County.
Who installs the most solar in Desert Hot Springs?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Desert Hot Springs are Sunrun (180), GAF Energy (169) and BRIGHT OPS (40). They account for 389 of the 836 residential solar installs interconnected there in that window.
In all, 4,511 homes in Desert Hot Springs have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 83 installers with installs in this window. 25 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | Sunrun | 547 | 547 |
| 2 | Renova Energy Corp | 450 | 450 |
| 3 | Vivint Solar Developer, LLC | 285 | 285 |
| 4 | Horizon Solar Power | 241 | 241 |
| 5 | GRID Alternatives | 209 | 209 |
| 6 | Tesla Energy Operations (formerly SolarCity) | 198 | 198 |
| 7 | FREEDOM FOREVER LLC | 195 | 195 |
| 8 | SUNNOVA ENERGY CORPORATION | 188 | 188 |
| 9 | GAF Energy | 169 | 169 |
| 10 | Bright Planet Solar | 104 | 104 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 676 | 24 |
| 2023 | 593 | 69 |
| 2024 | 426 | 314 |
| 2025 | 417 | 353 |
| 2026 (through Aug 31, 2026) | 288 | 245 |
Under the Net Billing Tariff (NEM 3.0)
1,151 of the 4,511 residential solar installs in Desert Hot Springs (25.5% of the 4,511 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 79.3% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Desert Hot Springs
| 1 | Sunrun | 258 | 252 | 97.7% |
| 2 | GAF Energy | 169 | 169 | 100.0% |
| 3 | BRIGHT OPS | 55 | 48 | 87.3% |
| 4 | SUNNOVA ENERGY CORPORATION | 46 | 33 | 71.7% |
| 5 | GSP (GOT SOLAR POWER) | 43 | 0 | 0.0% |
| 6 | FREEDOM FOREVER LLC | 39 | 35 | 89.7% |
| 7 | SOLAR FLARE | 39 | 2 | 5.1% |
| 8 | Current Home | 38 | 38 | 100.0% |
| 9 | V3 Electric | 37 | 37 | 100.0% |
| 10 | EXO Energy | 30 | 25 | 83.3% |
| 11 | BETTER EARTH ELECTRIC INC | 24 | 24 | 100.0% |
| 12 | Renova Energy Corp | 24 | 19 | 79.2% |
| 13 | Bright Planet Solar | 20 | 13 | 65.0% |
| 14 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 17 | 16 | 94.1% |
| 15 | BRYTON POWER LLC | 15 | 15 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 835 of Desert Hot Springs’ 836 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (380, 45.5%) used modules recorded as Qcells.
In the last 24 months, 836 of Desert Hot Springs’ 836 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (371, 44.4%) used inverters recorded as Tesla.
In the last 24 months, 692 of Desert Hot Springs’ 836 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (466, 67.3%) used batteries recorded as Tesla.
1,039 of 1,060 battery-paired PG&E and SCE installs (98.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 380 | 1,180 |
| LONGi | 132 | 406 | |
| JA Solar | 113 | 297 | |
| Canadian Solar | 46 | 359 | |
| Silfab | 43 | not in top list | |
| Inverter maker | Tesla | 371 | 456 |
| Enphase | 302 | 1,558 | |
| SolarEdge | 186 | 1,543 | |
| Delta Electronics | 16 | 68 | |
| Qcells | 14 | not in top list | |
| Battery maker | Tesla | 466 | 593 |
| Enphase | 119 | 167 | |
| SolarEdge | 76 | 153 | |
| FranklinWH | 17 | 17 | |
| LG | 6 | 70 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,901 of 4,511 installs, inverters on 4,509. See the methodology and the equipment index.
ZIP codes in Desert Hot Springs
ZIP codes with their own page where the utilities recorded Desert Hot Springs on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Desert Hot Springs
The SGIP report lists 104 battery storage projects with the city Desert Hot Springs, 47 with the status Paid ($386,285 in current incentive allocations, 642 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 47 | 642 | $386,285 |
| PBI in Process | 1 | 496 | $173,600 |
| Reserved | 7 | 88 | $158,308 |
| Pending Reservation | 4 | 62 | $96,918 |
| Waitlist | 11 | 156 | $286,567 |
| Cancelled | 31 | 4,038 | $2,244,636 |
| RRF Rejected | 3 | 27 | $3,987 |
Installers named on the most SGIP storage projects in Desert Hot Springs
13 of the 104 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Desert Hot Springs is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 4,511
- Last 24 months
- 836
- Capacity
- 33.8 MW DC
- Median system size
- 6.3 kW DC
- With battery storage
- 23.5% all time; 83.6% last 24 months
- Third-party owned
- 61.1% where reported
- Ownership types recorded
- PPA 1,789, lease 570, prepaid lease 17, other 187
- Median battery size
- 13.5 kWh
- Earliest install in data
- Jun 4, 2002
Common questions
How many homes in Desert Hot Springs have solar?
4,511 residential solar systems in Desert Hot Springs were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 836 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Desert Hot Springs?
83 installer names have at least one install interconnected in Desert Hot Springs in the last 24 months, and 360 appear in the full record.
How common are batteries with new solar in Desert Hot Springs?
23.5% of the solar installs interconnected in Desert Hot Springs include battery storage across all years, and 83.6% in the last 24 months (699 of 836).
How many solar installs in Desert Hot Springs are under NEM 3.0?
1,151 of the 4,511 residential solar installs in Desert Hot Springs (25.5% of the 4,511 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 79.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.