SUN CAPITAL ENERGY

How many solar installs has SUN CAPITAL ENERGY done in California, and which license number is on its installs?

SUN CAPITAL ENERGY has 278 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Sep 5, 2017 to Aug 28, 2026), most of them in Riverside County (118), San Bernardino County (71) and Los Angeles County (64). CSLB lists license 1021860 (SUN CAPITAL ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
278
Last 24 months
202
Total capacity
2,280.8 kW DC
Median system size
7.2 kW DC
With battery storage
75.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 98.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
62.9% of 278 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
207 installs, latest Aug 28, 2026
Ownership types recorded
PPA 171, lease 4
Median battery size
13.5 kWh (204 installs list a capacity)
First install
Sep 5, 2017
Latest install
Aug 28, 2026
Counties
7
Utilities
SCE 272, SDGE 6
CSLB license
1021860

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201710
2018100
201950
2020101
202170
202291
2023252
2024128
20257876
2026 (through Aug 31, 2026)121116

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

207 of its 278 interconnected installs (74.5% of the 278 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.5% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.07125.5%5 (7.1%)
Net Billing Tariff20774.5%199 (98.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 175 of SUN CAPITAL ENERGY’s installs the utility recorded a third-party ownership type: PPA 171, lease 4, prepaid lease 0, other 0. Across all installers, 3 residential systems list a third-party owner name that matches SUN CAPITAL ENERGY exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunrun108
Sun Run53
Sunpower8
Sun Capital Energy3
Omar Ramirez2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 202 of SUN CAPITAL ENERGY’s 202 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (89, 44.1%) used modules recorded as JA Solar.

In the last 24 months, 202 of SUN CAPITAL ENERGY’s 202 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (170, 84.2%) used inverters recorded as Tesla.

In the last 24 months, 192 of SUN CAPITAL ENERGY’s 202 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (166, 86.5%) used batteries recorded as Tesla.

203 of 204 battery-paired PG&E and SCE installs (99.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar8989
Elin Energy6666
Qcells1735
Waaree1218
Silfab6not in top list
Inverter makerTesla170172
Enphase2560
SolarEdge539
Foxess1not in top list
SunPower13
Battery makerTesla166166
Enphase1518
SunPower48
Sunvolt2not in top list
FranklinWH1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 277 of 278 installs, inverters on 278. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SUN CAPITAL ENERGY as developer on 6 battery storage projects and as installer on 4 (4 name it as both), 6 projects in all with 50 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Mar 29, 2021 to Dec 16, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled434$6,715
RRF Rejected217$3,358

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage434$6,7150$0
Not stated217$3,3580$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1021860SUN CAPITAL ENERGY (Corporation)CLEARC-10 Electrical ContractorDec 16, 2016Dec 31, 2026278

License numbers are the ones the utilities recorded on the interconnection applications (278 of 278 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1021860. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SUN CAPITAL ENERGY’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20252026Total
unincorporated San Diego County1021860112

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside118
San Bernardino71
Los Angeles64
Orange16
San Diego4
Ventura4
Imperial1

Top cities

CityInstalls
Blythe22
Palm Desert18
Cathedral City13
Yucca Valley13
Desert Hot Springs12
Twentynine Palms11
Palm Springs10
Covina7
Rancho Mirage7
Chino6
Lancaster6
Ontario6
Norco5
Pomona5
Corona4

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUN CAPITAL ENERGY267
Sun Capital Energy11

Common questions

Where does SUN CAPITAL ENERGY install solar?

Its installs are spread across 7 counties. The most are in Riverside County (118 installs), followed by San Bernardino County (71).

How often does SUN CAPITAL ENERGY install batteries with solar?

75.0% of its interconnected solar installs include battery storage across all years, and 98.0% in the last 24 months (193 of 197). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SUN CAPITAL ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

207 of its 278 interconnected installs (74.5% of the 278 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.5% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.