SUNLOGIX ENERGY INC

How many solar installs has SUNLOGIX ENERGY INC done in California, and which license number is on its installs?

SUNLOGIX ENERGY INC has 1,087 residential solar installs interconnected in California, active in the records from 2020 through 2026 (May 7, 2020 to Feb 24, 2026), most of them in Riverside County (971), San Bernardino County (91) and Los Angeles County (14). CSLB lists license 1063414 (SUNLOGIX AC, HEATING , & SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-20, C-46, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,087
Last 24 months
153
Total capacity
11,932.6 kW DC
Median system size
10 kW DC
With battery storage
23.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 82.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
14.1% of 1,087 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
279 installs, latest Feb 24, 2026
Ownership types recorded
PPA 3, lease 52, prepaid lease 1, other 97
Median battery size
13.5 kWh (252 installs list a capacity)
First install
May 7, 2020
Latest install
Feb 24, 2026
Counties
7
Utilities
SCE 1,083, PGE 3, SDGE 1
CSLB license
1063414

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
2020682
20211841
202225612
202327218
2024198131
202510382
2026 (through Aug 31, 2026)66

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

279 of its 1,087 interconnected installs (25.7% of the 1,087 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.5% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Feb 24, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.080874.3%42 (5.2%)
Net Billing Tariff27925.7%210 (75.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 153 of SUNLOGIX ENERGY INC’s installs the utility recorded a third-party ownership type: PPA 3, lease 52, prepaid lease 1, other 97. Across all installers, 46 residential systems list a third-party owner name that matches SUNLOGIX ENERGY INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SUNLOGIX ENERGY INC46
Sungage Financial29
SUNNOVA20
SUNPOWER19
Energy Loan Network15

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 153 of SUNLOGIX ENERGY INC’s 153 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (56, 36.6%) used modules recorded as REC.

In the last 24 months, 153 of SUNLOGIX ENERGY INC’s 153 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (107, 69.9%) used inverters recorded as Tesla.

In the last 24 months, 126 of SUNLOGIX ENERGY INC’s 153 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (116, 92.1%) used batteries recorded as Tesla.

247 of 252 battery-paired PG&E and SCE installs (98.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC56244
Qcells30129
Panasonic28244
CertainTeed2348
SunPower15not in top list
Inverter makerTesla107151
Enphase39503
SunPower7123
SolarEdge3272
Delta Electronics112
Battery makerTesla116180
FranklinWH55
Enphase29
SunPower231
LITHIUM BATTERY INC1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,045 of 1,087 installs, inverters on 1,087. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SUNLOGIX ENERGY INC as developer on 2 battery storage projects and as installer on 4 (2 name it as both), 4 projects in all with 184 kWh of storage. 1 have the status Paid, with $1,740 in current incentive allocations. Applications were received from Jan 11, 2021 to Apr 9, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid113$1,740
Cancelled3171$52,070

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage2120$23,2100$0
Equity Resiliency150$28,8600$0
Small Residential Storage113$1,7401$1,740

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1063414SUNLOGIX AC, HEATING , & SOLAR (Corporation)CLEAR, Judgement PendB General Building Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-46 Solar ContractorFeb 18, 2020Feb 29, 20281,087

License numbers are the ones the utilities recorded on the interconnection applications (1,087 of 1,087 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1063414. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SUNLOGIX ENERGY INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
unincorporated San Diego County106341411

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside971
San Bernardino91
Los Angeles14
Kern5
Orange4
San Diego1
Ventura1

Top cities

CityInstalls
Palm Desert283
Palm Springs270
Rancho Mirage154
Cathedral City133
Indian Wells66
Desert Hot Springs45
Joshua Tree27
Twentynine Palms27
Yucca Valley26
Morongo Valley7
Blythe6
Lancaster5
Bakersfield3
Landers3
Hemet2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNLOGIX ENERGY INC1,086
Sunlogix Energy1

Common questions

Where does SUNLOGIX ENERGY INC install solar?

Its installs are spread across 7 counties. The most are in Riverside County (971 installs), followed by San Bernardino County (91).

How often does SUNLOGIX ENERGY INC install batteries with solar?

23.2% of its interconnected solar installs include battery storage across all years, and 82.9% in the last 24 months (126 of 152). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SUNLOGIX ENERGY INC installs are under NEM 3.0 (the Net Billing Tariff)?

279 of its 1,087 interconnected installs (25.7% of the 1,087 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.5% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.