SUNLOGIX AC, HEATING , & SOLAR

How many solar installs has SUNLOGIX AC, HEATING , & SOLAR done in California, and which license number is on its installs?

SUNLOGIX AC, HEATING , & SOLAR has 101 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Dec 29, 2025 to Aug 31, 2026), most of them in Riverside County (98), San Bernardino County (2) and Los Angeles County (1). CSLB lists license 1063414 (SUNLOGIX AC, HEATING , & SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-20, C-46, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
101
Last 24 months
101
Total capacity
1,152.2 kW DC
Median system size
9.8 kW DC
With battery storage
84.2% all time; 84.2% last 24 months
Third-party owned
0.0% of 101 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
96 installs, latest Aug 31, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (85 installs list a capacity)
First install
Dec 29, 2025
Latest install
Aug 31, 2026
Counties
3
Utilities
SCE 101
CSLB license
1063414

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2025 to 2026

YearInstalls interconnectedWith battery storage
202544
2026 (through Aug 31, 2026)9781

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

96 of its 101 interconnected installs (95.0% of the 101 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.055.0%4 (80.0%)
Net Billing Tariff9695.0%81 (84.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SUNLOGIX AC, HEATING , & SOLAR’s installs. No residential system in the file lists a third-party owner name that matches SUNLOGIX AC, HEATING , & SOLAR exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 101 of SUNLOGIX AC, HEATING , & SOLAR’s 101 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (49, 48.5%) used modules recorded as SunPower.

In the last 24 months, 101 of SUNLOGIX AC, HEATING , & SOLAR’s 101 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (78, 77.2%) used inverters recorded as Tesla.

In the last 24 months, 85 of SUNLOGIX AC, HEATING , & SOLAR’s 101 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (83, 97.6%) used batteries recorded as Tesla.

85 of 85 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower4949
Hyundai2828
CertainTeed1313
LONGi66
REC33
Inverter makerTesla7878
Enphase1313
SolarEdge88
SMA22
SunPower22
Battery makerTesla8383
Enphase22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 101 of 101 installs, inverters on 101. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1063414SUNLOGIX AC, HEATING , & SOLAR (Corporation)CLEAR, Judgement PendB General Building Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-46 Solar ContractorFeb 18, 2020Feb 29, 2028101

License numbers are the ones the utilities recorded on the interconnection applications (101 of 101 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1063414. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SUNLOGIX AC, HEATING , & SOLAR’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
unincorporated San Diego County106341411

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Riverside98
San Bernardino2
Los Angeles1

Top cities

CityInstalls
Palm Springs33
Palm Desert23
Rancho Mirage18
Cathedral City14
Indian Wells7
Yucca Valley2
Blythe1
Desert Hot Springs1
North Palm Springs1
Whittier1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNLOGIX AC, HEATING , & SOLAR101

Common questions

Where does SUNLOGIX AC, HEATING , & SOLAR install solar?

Its installs are spread across 3 counties. The most are in Riverside County (98 installs), followed by San Bernardino County (2).

How often does SUNLOGIX AC, HEATING , & SOLAR install batteries with solar?

84.2% of its interconnected solar installs include battery storage across all years, and 84.2% in the last 24 months (85 of 101).

How many SUNLOGIX AC, HEATING , & SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

96 of its 101 interconnected installs (95.0% of the 101 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.