How many solar installs has Hot Purple Energy done in California, and which license number is on its installs?

Hot Purple Energy has 2,258 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Aug 25, 2010 to Aug 31, 2026), most of them in Riverside County (2,185), San Bernardino County (64) and Orange County (6). CSLB lists license 940550 (HOT PURPLE ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,258
Last 24 months
322
Total capacity
23,213.7 kW DC
Median system size
8.9 kW DC
With battery storage
40.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 93.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
5.9% of 2,098 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
253 installs, latest Aug 31, 2026
Ownership types recorded
lease 114, prepaid lease 7, other 2
Median battery size
27 kWh (914 installs list a capacity)
First install
Aug 25, 2010
Latest install
Aug 31, 2026
Counties
6
Utilities
SCE 2,256, SDGE 2
CSLB license
940550

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201050
2011220
2012520
2013840
20141070
20151390
20161561
20171940
20181715
201917860
202054
2021197104
2022311224
2023214127
2024134118
2025179168
2026 (through Aug 31, 2026)110103

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

253 of its 2,258 interconnected installs (11.2% of the 2,258 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.066929.6%not counted
NEM 2.01,33659.2%672 (50.3%)
Net Billing Tariff25311.2%237 (94.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 123 of Hot Purple Energy’s installs the utility recorded a third-party ownership type: PPA 0, lease 114, prepaid lease 7, other 2. Across all installers, 96 residential systems list a third-party owner name that matches Hot Purple Energy exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Hot Purple Energy96
SunPower Capital, LLC13
SunPower Solar Program I, LLC12
Hot Purple Emergy1
SunPower Corporation1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 322 of Hot Purple Energy’s 322 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (131, 40.7%) used modules recorded as REC.

In the last 24 months, 322 of Hot Purple Energy’s 322 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (191, 59.3%) used inverters recorded as Tesla.

In the last 24 months, 300 of Hot Purple Energy’s 322 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (271, 90.3%) used batteries recorded as Tesla.

857 of 914 battery-paired PG&E and SCE installs (93.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC131264
Panasonic94837
SunPower71680
Qcells6not in top list
Canadian Solar4not in top list
Inverter makerTesla191254
SolarEdge36587
Enphase30319
SMA20157
SunPower18566
Battery makerTesla271685
FranklinWH1717
Panasonic610
SolarEdge458
EcoFlow2not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,910 of 2,258 installs, inverters on 2,257. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Hot Purple Energy as developer on 826 battery storage projects and as installer on 826 (826 name it as both), 826 projects in all with 19,902 kWh of storage. 714 have the status Paid, with $4,428,723 in current incentive allocations. Applications were received from Oct 3, 2018 to Apr 29, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid71416,926$4,428,723
PBI in Process2119$26,100
Waitlist113$31,244
Cancelled1072,790$853,348
RRF Rejected253$8,120

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage59610,015$1,804,773527$1,564,054
Large-Scale Storage1827,985$1,703,261152$1,428,778
Equity Resiliency451,836$1,800,13735$1,435,891
Residential Solar and Storage Equity - AB 209 Non-POU113$31,2440$0
Not stated253$8,1200$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
940550HOT PURPLE ENERGY (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorDec 1, 2009Dec 31, 20272,240

License numbers are the ones the utilities recorded on the interconnection applications (2,241 of 2,258 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 940550. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Riverside2,185
San Bernardino64
Orange6
Los Angeles1
San Diego1
Santa Barbara1

Top cities

CityInstalls
Palm Springs1,367
Rancho Mirage295
Palm Desert228
Cathedral City153
Indian Wells97
Desert Hot Springs35
Yucca Valley25
Joshua Tree19
Morongo Valley10
Twentynine Palms6
Corona del Mar4
Pioneertown4
Whitewater3
Moreno Valley2
Banning1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Hot Purple Energy1,189
HOT PURPLE ENERGY1,069

Common questions

Where does Hot Purple Energy install solar?

Its installs are spread across 6 counties. The most are in Riverside County (2,185 installs), followed by San Bernardino County (64).

How often does Hot Purple Energy install batteries with solar?

40.5% of its interconnected solar installs include battery storage across all years, and 93.8% in the last 24 months (301 of 321). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Hot Purple Energy installs are under NEM 3.0 (the Net Billing Tariff)?

253 of its 2,258 interconnected installs (11.2% of the 2,258 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.