SWITCH ENERGY INC

How many solar installs has SWITCH ENERGY INC done in California, and which license number is on its installs?

SWITCH ENERGY INC has 375 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Sep 23, 2024 to Aug 28, 2026), most of them in San Bernardino County (98), Kern County (48) and Fresno County (37). CSLB lists license 1122223 (SWITCH ENERGY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
375
Last 24 months
375
Total capacity
2,795.1 kW DC
Median system size
6.8 kW DC
With battery storage
95.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 95.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
10.7% of 375 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
355 installs, latest Aug 28, 2026
Ownership types recorded
PPA 40
Median battery size
9.7 kWh (276 installs list a capacity)
First install
Sep 23, 2024
Latest install
Aug 28, 2026
Counties
28
Utilities
SCE 237, PGE 136, SDGE 2
CSLB license
1122223

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20241918
2025210193
2026 (through Aug 31, 2026)146145

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

355 of its 375 interconnected installs (94.7% of the 375 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.9% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.030.8%not counted
NEM 2.0174.5%11 (64.7%)
Net Billing Tariff35594.7%342 (96.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 40 of SWITCH ENERGY INC’s installs the utility recorded a third-party ownership type: PPA 40, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches SWITCH ENERGY INC exactly.

Third-party owner named on its installsInstalls
Thrive Power LLC39
Barbara Hollins1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 360 of SWITCH ENERGY INC’s 375 installs name a module maker in the “Generator Manufacturer” fields, and most of those (230, 63.9%) used modules recorded as Qcells.

In the last 24 months, 375 of SWITCH ENERGY INC’s 375 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (179, 47.7%) used inverters recorded as Enphase.

In the last 24 months, 346 of SWITCH ENERGY INC’s 375 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (141, 40.8%) used batteries recorded as Enphase.

345 of 356 battery-paired PG&E and SCE installs (96.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells230230
JinkoSolar5959
Mission Solar3131
Canadian Solar2929
JA Solar1616
Inverter makerEnphase179179
SolarEdge137137
Tesla9797
SMA66
SunPower66
Battery makerEnphase141141
SolarEdge111111
Tesla9898
SunPower11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 360 of 375 installs, inverters on 375. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1122223SWITCH ENERGY INC (Corporation)CLEARC-10 Electrical ContractorJun 14, 2024Jun 30, 2028375

License numbers are the ones the utilities recorded on the interconnection applications (375 of 375 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1122223. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Bernardino98
Kern48
Fresno37
Los Angeles37
Riverside27
Tulare27
Kings21
San Joaquin15
Monterey13
Madera6
Orange6
Merced5
Santa Cruz5
Ventura5
Contra Costa4
Santa Clara3
El Dorado2
San Diego2
Shasta2
Tehama2
Tuolumne2
Yuba2
Alameda1
Mariposa1
San Benito1
San Mateo1
Sonoma1
Yolo1

Top cities

CityInstalls
California City26
Apple Valley23
Victorville21
Fresno19
Avenal10
Lancaster10
Stockton10
Fontana9
Greenfield9
Hesperia9
Visalia9
Bakersfield8
Ridgecrest7
Adelanto6
Desert Hot Springs6

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SWITCH ENERGY INC372
Switch Energy3

Common questions

Where does SWITCH ENERGY INC install solar?

Its installs are spread across 28 counties. The most are in San Bernardino County (98 installs), followed by Kern County (48).

How often does SWITCH ENERGY INC install batteries with solar?

95.4% of its interconnected solar installs include battery storage across all years, and 95.4% in the last 24 months (356 of 373). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SWITCH ENERGY INC installs are under NEM 3.0 (the Net Billing Tariff)?

355 of its 375 interconnected installs (94.7% of the 375 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 96.9% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.