Solar installers in Ridgecrest, California

Most installs here are in Kern County.

Who installs the most solar in Ridgecrest?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Ridgecrest are ZURN ELECTRIC INC (151), BRIGHT OPS (70) and Sunrun (28). They account for 249 of the 403 residential solar installs interconnected there in that window.

In all, 4,159 homes in Ridgecrest have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 65 installers with installs in this window. 20 installs in the window were self-installed or had no installer recorded.

1ZURN ELECTRIC INC151633
2BRIGHT OPS70116
3Sunrun2875
4VIBE SOLAR21299
5FREEDOM FOREVER LLC769
6SWITCH ENERGY INC77
7LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC611
8DISCOUNT CONSTRUCTION & ENGINEERING55
9EXO Energy419
10FREEDOM FOREVER SOUTHERN CALIFORNIA LLC44
11DEMAND CONSTRUCTION33
12PORTICADE ENERGY LLC33
13Quality Home Services335
14SIDEWINDER SOLAR33
15Sweitzer Solar Solutions3144
16YouVee Solar3129
17AMECO SOLAR LLC23
18CES ROOFING22
19ILUM ENERGY SOLUTIONS22
20Infinity Energy, Inc241
21MARS HOME SOLUTIONS LLC22
22MERRILL SOLAR SOLUTIONS LLC210
23MMC ELECTRIC INC22
24MONA LEE SOLAR CA LLC22
25Semper Solaris Construction Inc252

Most installs, all time

1ZURN ELECTRIC INC633633
2VIBE SOLAR299299
3ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING256256
4Tesla Energy Operations (formerly SolarCity)214214
5Bright Planet Solar199199
6Sweitzer Solar Solutions144144
7YouVee Solar129129
8BRIGHT OPS116116
9Verengo102102
10TITANIUM SOLAR LLC9696

Installs by year

YearInstalls interconnectedWith battery storage
202270812
202353947
2024301186
2025215142
2026 (through Aug 31, 2026)12977

Under the Net Billing Tariff (NEM 3.0)

609 of the 4,159 residential solar installs in Ridgecrest (14.6% of the 4,159 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 69.1% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Ridgecrest

1ZURN ELECTRIC INC1837038.3%
2BRIGHT OPS11611498.3%
3Bright Planet Solar483062.5%
4Sunrun3636100.0%
5VIBE SOLAR343397.1%
6EXO Energy17529.4%
7FREEDOM FOREVER LLC161593.8%
8Quality Home Services10990.0%
9LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC99100.0%
10Semper Solaris Construction Inc8450.0%
11SWITCH ENERGY INC77100.0%
12DISCOUNT CONSTRUCTION & ENGINEERING55100.0%
13TITANIUM SOLAR LLC5240.0%
14ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING4375.0%
15FREEDOM FOREVER SOUTHERN CALIFORNIA LLC44100.0%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 401 of Ridgecrest’s 403 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (139, 34.7%) used modules recorded as Hyundai.

In the last 24 months, 403 of Ridgecrest’s 403 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (192, 47.6%) used inverters recorded as Enphase.

In the last 24 months, 262 of Ridgecrest’s 403 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (102, 38.9%) used batteries recorded as Tesla.

470 of 482 battery-paired PG&E and SCE installs (97.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai139544
Qcells91979
LONGi42257
JA Solar31not in top list
Canadian Solar23264
Inverter makerEnphase1921,581
SolarEdge1031,500
Tesla67153
PointGuard Energy Inc.29not in top list
Qcells5not in top list
Battery makerTesla102129
Enphase64117
SolarEdge53148
PointGuard Energy Inc.2929
Sigenergy55

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,396 of 4,159 installs, inverters on 4,150. See the methodology and the equipment index.

ZIP codes in Ridgecrest

ZIP codes with their own page where the utilities recorded Ridgecrest on at least 10% of the ZIP’s installs, through Aug 31, 2026.

935554,1544,157401

SGIP battery storage projects in Ridgecrest

The SGIP report lists 29 battery storage projects with the city Ridgecrest, 13 with the status Paid ($38,845 in current incentive allocations, 201 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid13201$38,845
Reserved12,287$418,010
Pending Reservation228$47,729
Waitlist113$29,173
Cancelled123,795$3,027,559

Installers named on the most SGIP storage projects in Ridgecrest

InstallerProjectsPaid
Semper Solaris Construction Inc1310
Fuzion Home Services, Inc.42
Option One Corporation10
Solar Optimum Inc.10
SOLAR SAVINGS DIRECT INC10
SWELL SERVICES INC DBA SWELL CONTRACTORS10
Tesla Energy Operations (formerly SolarCity)10
VIBE SOLAR10

6 of the 29 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

SolarAPP+ automated permitting

Ridgecrest is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

At a glance

Residential solar installs
4,159
Last 24 months
403
Capacity
28.7 MW DC
Median system size
6.5 kW DC
With battery storage
11.6% all time; 67.0% last 24 months
Third-party owned
17.9% where reported
Ownership types recorded
PPA 559, lease 104, prepaid lease 1, other 17
Median battery size
13.3 kWh
Earliest install in data
Jan 10, 2002

Common questions

How many homes in Ridgecrest have solar?

4,159 residential solar systems in Ridgecrest were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 403 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Ridgecrest?

65 installer names have at least one install interconnected in Ridgecrest in the last 24 months, and 285 appear in the full record.

How common are batteries with new solar in Ridgecrest?

11.6% of the solar installs interconnected in Ridgecrest include battery storage across all years, and 67.0% in the last 24 months (270 of 403).

How many solar installs in Ridgecrest are under NEM 3.0?

609 of the 4,159 residential solar installs in Ridgecrest (14.6% of the 4,159 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 69.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.