Solar installers in Ridgecrest, California
Most installs here are in Kern County.
Who installs the most solar in Ridgecrest?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Ridgecrest are ZURN ELECTRIC INC (151), BRIGHT OPS (70) and Sunrun (28). They account for 249 of the 403 residential solar installs interconnected there in that window.
In all, 4,159 homes in Ridgecrest have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 65 installers with installs in this window. 20 installs in the window were self-installed or had no installer recorded.
| 1 | ZURN ELECTRIC INC | 151 | 633 |
| 2 | BRIGHT OPS | 70 | 116 |
| 3 | Sunrun | 28 | 75 |
| 4 | VIBE SOLAR | 21 | 299 |
| 5 | FREEDOM FOREVER LLC | 7 | 69 |
| 6 | SWITCH ENERGY INC | 7 | 7 |
| 7 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 6 | 11 |
| 8 | DISCOUNT CONSTRUCTION & ENGINEERING | 5 | 5 |
| 9 | EXO Energy | 4 | 19 |
| 10 | FREEDOM FOREVER SOUTHERN CALIFORNIA LLC | 4 | 4 |
| 11 | DEMAND CONSTRUCTION | 3 | 3 |
| 12 | PORTICADE ENERGY LLC | 3 | 3 |
| 13 | Quality Home Services | 3 | 35 |
| 14 | SIDEWINDER SOLAR | 3 | 3 |
| 15 | Sweitzer Solar Solutions | 3 | 144 |
| 16 | YouVee Solar | 3 | 129 |
| 17 | AMECO SOLAR LLC | 2 | 3 |
| 18 | CES ROOFING | 2 | 2 |
| 19 | ILUM ENERGY SOLUTIONS | 2 | 2 |
| 20 | Infinity Energy, Inc | 2 | 41 |
| 21 | MARS HOME SOLUTIONS LLC | 2 | 2 |
| 22 | MERRILL SOLAR SOLUTIONS LLC | 2 | 10 |
| 23 | MMC ELECTRIC INC | 2 | 2 |
| 24 | MONA LEE SOLAR CA LLC | 2 | 2 |
| 25 | Semper Solaris Construction Inc | 2 | 52 |
Most installs, all time
| 1 | ZURN ELECTRIC INC | 633 | 633 |
| 2 | VIBE SOLAR | 299 | 299 |
| 3 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 256 | 256 |
| 4 | Tesla Energy Operations (formerly SolarCity) | 214 | 214 |
| 5 | Bright Planet Solar | 199 | 199 |
| 6 | Sweitzer Solar Solutions | 144 | 144 |
| 7 | YouVee Solar | 129 | 129 |
| 8 | BRIGHT OPS | 116 | 116 |
| 9 | Verengo | 102 | 102 |
| 10 | TITANIUM SOLAR LLC | 96 | 96 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 708 | 12 |
| 2023 | 539 | 47 |
| 2024 | 301 | 186 |
| 2025 | 215 | 142 |
| 2026 (through Aug 31, 2026) | 129 | 77 |
Under the Net Billing Tariff (NEM 3.0)
609 of the 4,159 residential solar installs in Ridgecrest (14.6% of the 4,159 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 69.1% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Ridgecrest
| 1 | ZURN ELECTRIC INC | 183 | 70 | 38.3% |
| 2 | BRIGHT OPS | 116 | 114 | 98.3% |
| 3 | Bright Planet Solar | 48 | 30 | 62.5% |
| 4 | Sunrun | 36 | 36 | 100.0% |
| 5 | VIBE SOLAR | 34 | 33 | 97.1% |
| 6 | EXO Energy | 17 | 5 | 29.4% |
| 7 | FREEDOM FOREVER LLC | 16 | 15 | 93.8% |
| 8 | Quality Home Services | 10 | 9 | 90.0% |
| 9 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 9 | 9 | 100.0% |
| 10 | Semper Solaris Construction Inc | 8 | 4 | 50.0% |
| 11 | SWITCH ENERGY INC | 7 | 7 | 100.0% |
| 12 | DISCOUNT CONSTRUCTION & ENGINEERING | 5 | 5 | 100.0% |
| 13 | TITANIUM SOLAR LLC | 5 | 2 | 40.0% |
| 14 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 4 | 3 | 75.0% |
| 15 | FREEDOM FOREVER SOUTHERN CALIFORNIA LLC | 4 | 4 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 401 of Ridgecrest’s 403 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (139, 34.7%) used modules recorded as Hyundai.
In the last 24 months, 403 of Ridgecrest’s 403 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (192, 47.6%) used inverters recorded as Enphase.
In the last 24 months, 262 of Ridgecrest’s 403 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (102, 38.9%) used batteries recorded as Tesla.
470 of 482 battery-paired PG&E and SCE installs (97.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Hyundai | 139 | 544 |
| Qcells | 91 | 979 | |
| LONGi | 42 | 257 | |
| JA Solar | 31 | not in top list | |
| Canadian Solar | 23 | 264 | |
| Inverter maker | Enphase | 192 | 1,581 |
| SolarEdge | 103 | 1,500 | |
| Tesla | 67 | 153 | |
| PointGuard Energy Inc. | 29 | not in top list | |
| Qcells | 5 | not in top list | |
| Battery maker | Tesla | 102 | 129 |
| Enphase | 64 | 117 | |
| SolarEdge | 53 | 148 | |
| PointGuard Energy Inc. | 29 | 29 | |
| Sigenergy | 5 | 5 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,396 of 4,159 installs, inverters on 4,150. See the methodology and the equipment index.
ZIP codes in Ridgecrest
ZIP codes with their own page where the utilities recorded Ridgecrest on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 93555 | 4,154 | 4,157 | 401 |
SGIP battery storage projects in Ridgecrest
The SGIP report lists 29 battery storage projects with the city Ridgecrest, 13 with the status Paid ($38,845 in current incentive allocations, 201 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 13 | 201 | $38,845 |
| Reserved | 1 | 2,287 | $418,010 |
| Pending Reservation | 2 | 28 | $47,729 |
| Waitlist | 1 | 13 | $29,173 |
| Cancelled | 12 | 3,795 | $3,027,559 |
Installers named on the most SGIP storage projects in Ridgecrest
6 of the 29 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Ridgecrest is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 4,159
- Last 24 months
- 403
- Capacity
- 28.7 MW DC
- Median system size
- 6.5 kW DC
- With battery storage
- 11.6% all time; 67.0% last 24 months
- Third-party owned
- 17.9% where reported
- Ownership types recorded
- PPA 559, lease 104, prepaid lease 1, other 17
- Median battery size
- 13.3 kWh
- Earliest install in data
- Jan 10, 2002
Common questions
How many homes in Ridgecrest have solar?
4,159 residential solar systems in Ridgecrest were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 403 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Ridgecrest?
65 installer names have at least one install interconnected in Ridgecrest in the last 24 months, and 285 appear in the full record.
How common are batteries with new solar in Ridgecrest?
11.6% of the solar installs interconnected in Ridgecrest include battery storage across all years, and 67.0% in the last 24 months (270 of 403).
How many solar installs in Ridgecrest are under NEM 3.0?
609 of the 4,159 residential solar installs in Ridgecrest (14.6% of the 4,159 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 69.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.