How many solar installs has Fuzion Home Services, Inc. done in California, and which license number is on its installs?

Fuzion Home Services, Inc. has 150 residential solar installs interconnected in California, active in the records from 2017 through 2024 (Apr 18, 2017 to Feb 29, 2024), most of them in Kern County (90), Los Angeles County (24) and Tulare County (16). CSLB lists license 1025073 (FUZION ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-39, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
150
Last 24 months
0
Total capacity
1,025 kW DC
Median system size
6.6 kW DC
With battery storage
11.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 150 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
9.8 kWh (17 installs list a capacity)
First install
Apr 18, 2017
Latest install
Feb 29, 2024
Counties
11
Utilities
SCE 129, PGE 18, SDGE 3
CSLB license
1025073

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
2017360
2018281
201950
20207514
202152
202200
202300
202410
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 150 interconnected installs with a tariff recorded (150) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.064.0%not counted
NEM 2.014496.0%17 (12.1%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Fuzion Home Services, Inc.’s installs. No residential system in the file lists a third-party owner name that matches Fuzion Home Services, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 149 of Fuzion Home Services, Inc.’s 150 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (59, 39.6%) used modules recorded as Panasonic.

Across all years, 150 of Fuzion Home Services, Inc.’s 150 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (126, 84.0%) used inverters recorded as SolarEdge.

Across all years, 17 of Fuzion Home Services, Inc.’s 150 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (17, 100.0%) used batteries recorded as LG.

17 of 17 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPanasonic059
S-Energy045
Canadian Solar026
Hyundai010
SolarWorld05
Inverter makerSolarEdge0126
Enphase022
SunPower02
Power-One01
Battery makerLG017

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 149 of 150 installs, inverters on 150. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Fuzion Home Services, Inc. as developer on 8 battery storage projects and as installer on 7 (7 name it as both), 8 projects in all with 91 kWh of storage. 3 have the status Paid, with $22,325 in current incentive allocations. Applications were received from Dec 30, 2020 to Sep 6, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid337$22,325
Cancelled445$24,424
RRF Rejected110$1,456

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage543$8,3372$3,119
Equity Resiliency238$38,4121$19,206
Not stated110$1,4560$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1025073FUZION ENERGY (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-39 Roofing ContractorMar 23, 2017Mar 31, 2027149

License numbers are the ones the utilities recorded on the interconnection applications (150 of 150 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1025073. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Kern90
Los Angeles24
Tulare16
San Bernardino6
Kings4
Santa Barbara4
San Diego2
Fresno1
Orange1
San Luis Obispo1
Ventura1

Top cities

CityInstalls
Ridgecrest40
Tehachapi12
Bakersfield11
Visalia10
Lancaster9
Lake Isabella8
Wofford Heights5
Bodfish4
Hanford4
Santa Maria4
Tulare4
Valencia3
California City2
Canyon Country2
Frazier Park2

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
FUZION HOME SERVICES INC124
Fuzion Home Services, Inc.17
Fuzion Home Services6
Fuzion Home Services Inc2
FUZION HOME SERVICES, INC.1

Common questions

Where does Fuzion Home Services, Inc. install solar?

Its installs are spread across 11 counties. The most are in Kern County (90 installs), followed by Los Angeles County (24).

How often does Fuzion Home Services, Inc. install batteries with solar?

11.6% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Fuzion Home Services, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 150 interconnected installs with a tariff recorded (150) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.