Renova Energy Corp: latest installs on record in California
Is Renova Energy Corp still installing solar in California?
The most recent install credited to Renova Energy Corp in California’s interconnection data was approved in April 2026; it has 165 in the last 12 complete months (September 2025 through August 2026). The license number recorded on most of those installs, 910836, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy.
- Latest install approved
- Apr 29, 2026
- Last 12 complete months
- 165 installs, September 2025 through August 2026
- Last 24 months
- 440 installs
- All time
- 8,735 installs, first approved May 7, 2008
- License on most recent installs
- 910836, not found in the CSLB License Master file pulled Nov 4, 2026
- Full record
- Renova Energy Corp installer page
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs in each of the last 12 complete months
| Month approved | Installs credited to Renova Energy Corp |
|---|---|
| August 2026 | 0 |
| July 2026 | 0 |
| June 2026 | 0 |
| May 2026 | 0 |
| April 2026 | 3 |
| March 2026 | 4 |
| February 2026 | 31 |
| January 2026 | 29 |
| December 2025 | 42 |
| November 2025 | 18 |
| October 2025 | 24 |
| September 2025 | 14 |
| Total | 165 |
Net Billing Tariff installs
720 of the installs credited to Renova Energy Corp (8.2% of the 8,735 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.1% of those include battery storage. The latest was approved Apr 29, 2026.
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2008 | 2 | 0 |
| 2009 | 7 | 0 |
| 2010 | 13 | 0 |
| 2011 | 12 | 0 |
| 2012 | 42 | 0 |
| 2013 | 111 | 0 |
| 2014 | 221 | 0 |
| 2015 | 458 | 0 |
| 2016 | 577 | 0 |
| 2017 | 689 | 7 |
| 2018 | 734 | 51 |
| 2019 | 689 | 46 |
| 2020 | 672 | 82 |
| 2021 | 930 | 74 |
| 2022 | 1,311 | 140 |
| 2023 | 1,418 | 132 |
| 2024 | 482 | 341 |
| 2025 | 300 | 269 |
| 2026 (through Aug 31, 2026) | 67 | 63 |
License numbers on installs in the last 12 months
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Expires | Installs |
|---|---|---|---|---|---|
| 910836 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 165 | |||
Names written on these installs: RENOVA ENERGY CORP (165). 165 of the 165 carry a CSLB number. Numbers on fewer than 3 installs or 1% of them are left out as likely typos. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Other installer names in the records
Installer names that share a license number with Renova Energy Corp, or contain the same brand word. A shared word or number does not by itself mean the same company.
| Installer | Why listed | Latest install | Last 12 months | All time |
|---|---|---|---|---|
| RENOVA SOLAR | same license 910836 | September 2017 | 0 | 53 |
How to read this record
Each install is a home solar system that Pacific Gas and Electric, Southern California Edison or San Diego Gas & Electric approved to connect to the grid. The month is the App Approved date, which comes after the system is installed. The installer is the name written on the interconnection application. Counts run through Aug 31, 2026, the latest date in the DG Stats file Interconnected_Project_Sites_2026-08-31.zip.
To check a license today, use CSLB’s license check. See every installer’s latest install and the large installers with no installs in the last six months.
Common questions
When was the last install credited to Renova Energy Corp approved?
The latest App Approved date on an install credited to Renova Energy Corp is Apr 29, 2026, in the DG Stats file current through Aug 31, 2026. Its first was May 7, 2008.
How many solar installs has Renova Energy Corp had in California in the last 12 months?
165 residential solar installs credited to Renova Energy Corp were approved for interconnection from September 2025 through August 2026. Months with none recorded: May 2026, June 2026, July 2026 and August 2026. Across all years it has 8,735.
Does a recent install mean Renova Energy Corp is still in business?
No. The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy. An installer name can stay on applications filed before a change, and a business can work under a new name or license.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. Neither record states whether a company is in business. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors