JJ ENERGY INC

How many solar installs has JJ ENERGY INC done in California, and which license number is on its installs?

JJ ENERGY INC has 85 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Jun 2, 2022 to Aug 21, 2026), most of them in Riverside County (76) and San Bernardino County (9). CSLB lists license 1087337 (JJ ENERGY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
85
Last 24 months
45
Total capacity
1,066.3 kW DC
Median system size
10.3 kW DC
With battery storage
47.1% all time; 82.2% last 24 months
Third-party owned
1.2% of 85 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
44 installs, latest Aug 14, 2026
Ownership types recorded
prepaid lease 1
Median battery size
27 kWh (40 installs list a capacity)
First install
Jun 2, 2022
Latest install
Aug 21, 2026
Counties
2
Utilities
SCE 85
CSLB license
1087337

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202270
2023292
202462
20252117
2026 (through Aug 31, 2026)2219

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

44 of its 85 interconnected installs (51.8% of the 85 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 79.5% of those include battery storage. The latest Net Billing Tariff install was approved Aug 14, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04148.2%5 (12.2%)
Net Billing Tariff4451.8%35 (79.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of JJ ENERGY INC’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 1, other 0. No residential system in the file lists a third-party owner name that matches JJ ENERGY INC exactly.

Third-party owner named on its installsInstalls
HDM Capital1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 45 of JJ ENERGY INC’s 45 installs name a module maker in the “Generator Manufacturer” fields, and most of those (27, 60.0%) used modules recorded as SunPower.

In the last 24 months, 45 of JJ ENERGY INC’s 45 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (29, 64.4%) used inverters recorded as Tesla.

In the last 24 months, 34 of JJ ENERGY INC’s 45 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (30, 88.2%) used batteries recorded as Tesla.

37 of 40 battery-paired PG&E and SCE installs (92.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower2727
REC831
Hyundai44
Tesla3not in top list
Grape Solar1not in top list
Inverter makerTesla2929
Enphase928
SunPower47
SolarEdge219
Delta Electronics11
Battery makerTesla3030
FranklinWH44

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 85 of 85 installs, inverters on 85. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1087337JJ ENERGY INC (Corporation)CLEARC-10 Electrical ContractorFeb 15, 2022Feb 29, 202885

License numbers are the ones the utilities recorded on the interconnection applications (85 of 85 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1087337. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Riverside76
San Bernardino9

Top cities

CityInstalls
Palm Desert22
Palm Springs20
Rancho Mirage11
Desert Hot Springs10
Cathedral City6
Indian Wells6
Joshua Tree4
Twentynine Palms2
Yucca Valley2
Hemet1
Redlands1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
JJ ENERGY INC85

Common questions

Where does JJ ENERGY INC install solar?

Its installs are spread across 2 counties. The most are in Riverside County (76 installs), followed by San Bernardino County (9).

How often does JJ ENERGY INC install batteries with solar?

47.1% of its interconnected solar installs include battery storage across all years, and 82.2% in the last 24 months (37 of 45).

How many JJ ENERGY INC installs are under NEM 3.0 (the Net Billing Tariff)?

44 of its 85 interconnected installs (51.8% of the 85 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 79.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.