City of Riverside - (CA): net-metered solar
How many net-metered solar customers does City of Riverside - (CA) have?
City of Riverside - (CA) reported 8,248 net-metered solar PV installations (7,975 residential) with 79 MW of PV capacity (reported in DC) to EIA for 2025. It also reported 6 distributed generators that are not net metered, 1.1 MW in all.
From EIA’s 2025 Form EIA-861 files, downloaded Nov 16, 2026. Figures are as the utility reported them to EIA.
- EIA utility number
- 16088
- Ownership type (EIA)
- Municipal
- Capacity unit reported
- DC
- Balancing authority
- CISO
- California counties served (EIA)
- Riverside
- City page
- Riverside
This utility’s customers are not in the PG&E, SCE and SDG&E interconnection records the installer pages on this site are built from.
Net-metered solar PV by sector, 2025
| Measure | Residential | Commercial | Industrial | Transportation | Total |
|---|---|---|---|---|---|
| PV installations | 7,975 | 273 | 8,248 | ||
| PV capacity MW | 48.58 | 30.42 | 79 |
Other net metering fields, 2025
- Energy sold back (MWh)
- 1,344
- Virtual net metering under 1 MW: customers
- 0
- Virtual net metering under 1 MW: capacity
- 0 MW
- Virtual net metering 1 MW and over: customers
- 0
- Virtual net metering 1 MW and over: capacity
- 0 MW
- PV-paired battery installations
- 0
- PV-paired battery capacity
- 0 MW
- PV-paired battery energy capacity (MWh)
- 0
- Batteries not paired with PV: installations
- 0
- Batteries not paired with PV: capacity
- 0 MW
Distributed generators that are not net metered, 2025
- Number of generators
- 6
- Total capacity
- 1.1 MW
- Photovoltaic capacity
- 0.2 MW
- Battery capacity
- 0 MW
EIA’s note on this file: “Note: Data includes distributed generators less than 1 MW capacity, not net metered, and not reported on the EIA-860. Data is reported as collected. Type refers to the nature of the PV system reporting. EIA uses the type reported from Net Metering unless they informed us otherwise. All non AC units are converted to AC when summed. Generators may be installed at or near a customer's site, or at other locations. They may be owned by either the customers of the distribution utility or the utility. Other generators includes generators for which technology is not specified. Number of generators is not available by individual technology type. Some utilities reclassified net metering as non net metering distributed, or vice versa. Some utilties were double counting net metering as distributed in previous years. Source: U.S. Energy Information Administration, Form EIA-861, 'Annual Electric Power Industry Report.'”
City of Riverside - (CA) has no rows in EIA’s 2026 EIA-861M net metering workbook, which covers a sample of utilities each month.
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
All California utilities and EIA’s definitions, quoted.
Sources
- U.S. Energy Information Administration: Form EIA-861, Annual Electric Power Industry Report, detailed data files
- U.S. Energy Information Administration: Form EIA-861M, Monthly Electric Power Industry Report, net metering file
Records last pulled Nov 16, 2026. Every entry links to the original public record.