Quantum Solar Designs, Inc.

How many solar installs has Quantum Solar Designs, Inc. done in California, and which license number is on its installs?

Quantum Solar Designs, Inc. has 829 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Oct 5, 2013 to Feb 9, 2026), most of them in Ventura County (652), Los Angeles County (127) and Santa Barbara County (37). The license number recorded on most of its installs, 956241, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
829
Last 24 months
93
Total capacity
6,751 kW DC
Median system size
7.5 kW DC
With battery storage
20.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 93.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 828 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
107 installs, latest Feb 9, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (170 installs list a capacity)
First install
Oct 5, 2013
Latest install
Feb 9, 2026
Counties
6
Utilities
SCE 809, PGE 16, SDGE 4
CSLB license
956241

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201310
201430
201520
201650
2017411
2018691
2019722
2020935
202111313
20221399
202315920
20244739
20257267
2026 (through Aug 31, 2026)1313

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

107 of its 829 interconnected installs (12.9% of the 829 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.5% of those include battery storage. The latest Net Billing Tariff install was approved Feb 9, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0101.2%not counted
NEM 2.071285.9%70 (9.9%)
Net Billing Tariff10712.9%100 (93.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Quantum Solar Designs, Inc.’s installs. No residential system in the file lists a third-party owner name that matches Quantum Solar Designs, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 93 of Quantum Solar Designs, Inc.’s 93 installs name a module maker in the “Generator Manufacturer” fields, and most of those (64, 68.8%) used modules recorded as Qcells.

In the last 24 months, 93 of Quantum Solar Designs, Inc.’s 93 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (71, 76.3%) used inverters recorded as Enphase.

In the last 24 months, 87 of Quantum Solar Designs, Inc.’s 93 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (50, 57.5%) used batteries recorded as Enphase.

165 of 170 battery-paired PG&E and SCE installs (97.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells64756
Silfab1717
JinkoSolar44
JA Solar33
SunPower2not in top list
Inverter makerEnphase71530
Tesla1938
SMA2not in top list
SunPower152
Battery makerEnphase50124
Tesla1919
FranklinWH1819

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 796 of 829 installs, inverters on 828. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Quantum Solar Designs, Inc. as developer on 56 battery storage projects and as installer on 55 (55 name it as both), 56 projects in all with 889 kWh of storage. 17 have the status Paid, with $119,738 in current incentive allocations. Applications were received from Oct 7, 2020 to Dec 23, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid17242$119,738
Reserved25384$70,020
Pending Reservation10190$28,231
Cancelled358$33,309
RRF Rejected115$2,250

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage45717$111,2519$22,410
Equity Resiliency9143$136,4797$93,759
Large-Scale Storage114$3,5691$3,569
Not stated115$2,2500$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
956241Not found in the CSLB License Master file pulled Nov 4, 2026826

License numbers are the ones the utilities recorded on the interconnection applications (826 of 829 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Ventura652
Los Angeles127
Santa Barbara37
San Bernardino5
Orange4
San Diego4

Top cities

CityInstalls
Camarillo241
Simi Valley93
Thousand Oaks93
Newbury Park58
Agoura Hills33
Ventura32
Westlake Village27
Oak Park26
Moorpark25
Santa Rosa Valley19
Oxnard18
Santa Barbara16
Calabasas12
Ojai12
Fillmore11

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
QUANTUM SOLAR DESIGNS INC644
Quantum Solar Designs, Inc.164
QUANTUM SOLAR DESIGNS, INC.13
Quantum Solar Designs, Inc6
Quantum Solar Designs Inc2

Common questions

Where does Quantum Solar Designs, Inc. install solar?

Its installs are spread across 6 counties. The most are in Ventura County (652 installs), followed by Los Angeles County (127).

How often does Quantum Solar Designs, Inc. install batteries with solar?

20.6% of its interconnected solar installs include battery storage across all years, and 93.5% in the last 24 months (87 of 93). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Quantum Solar Designs, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

107 of its 829 interconnected installs (12.9% of the 829 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.