BTA Solar & Electrical
How many solar installs has BTA Solar & Electrical done in California, and which license number is on its installs?
BTA Solar & Electrical has 94 residential solar installs interconnected in California, active in the records from 2018 through 2020 (Aug 30, 2018 to Apr 30, 2020), most of them in San Joaquin County (91), Calaveras County (1) and San Mateo County (1). CSLB lists license 841362 (BTA SOLAR ELECTRICAL SERVICES INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Aug 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 94
- Last 24 months
- 0
- Total capacity
- 456.1 kW DC
- Median system size
- 1.2 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 51.1% of 94 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- lease 4, other 44
- First install
- Aug 30, 2018
- Latest install
- Apr 30, 2020
- Counties
- 4
- Utilities
- PGE 94
- CSLB license
- 841362
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2018 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2018 | 22 | 0 |
| 2019 | 69 | 0 |
| 2020 | 3 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 94 interconnected installs with a tariff recorded (94) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 94 | 100.0% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 48 of BTA Solar & Electrical’s installs the utility recorded a third-party ownership type: PPA 0, lease 4, prepaid lease 0, other 44. No residential system in the file lists a third-party owner name that matches BTA Solar & Electrical exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| visionary | 48 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 94 of BTA Solar & Electrical’s 94 installs name a module maker in the “Generator Manufacturer” fields, and most of those (85, 90.4%) used modules recorded as Auxin Solar.
Across all years, 94 of BTA Solar & Electrical’s 94 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (63, 67.0%) used inverters recorded as APsystems (Altenergy Power System).
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Auxin Solar | 0 | 85 |
| Advance Power | 0 | 8 | |
| Trina Solar | 0 | 1 | |
| Inverter maker | APsystems (Altenergy Power System) | 0 | 63 |
| SMA | 0 | 31 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 94 of 94 installs, inverters on 94. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 841362 | BTA SOLAR ELECTRICAL SERVICES INC (Corporation) | CLEAR | C-10 Electrical Contractor | Jun 22, 2004 | Aug 31, 2028 | 90 |
License numbers are the ones the utilities recorded on the interconnection applications (94 of 94 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 841362. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- BTA Solar Electrical Services, Inc: 254 installs, license 841362
- BTA Solar: 144 installs, license 841362
Counties
| County | Installs |
|---|---|
| San Joaquin | 91 |
| Calaveras | 1 |
| San Mateo | 1 |
| Solano | 1 |
Top cities
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| BTA Solar & Electrical | 94 |
Common questions
Where does BTA Solar & Electrical install solar?
Its installs are spread across 4 counties. The most are in San Joaquin County (91 installs), followed by Calaveras County (1).
How often does BTA Solar & Electrical install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many BTA Solar & Electrical installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 94 interconnected installs with a tariff recorded (94) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.