Evans Energy Systems has 53 residential solar installs interconnected in California, active in the records from 2012 through 2025 (Sep 19, 2012 to Dec 10, 2025), most of them in Santa Cruz County (49), Santa Clara County (2) and Monterey County (1). CSLB lists license 967527 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
53
Last 24 months
4
Total capacity
339.7 kW DC
Median system size
5.8 kW DC
With battery storage
7.5% all time; 75.0% last 24 months
Third-party owned
0.0% of 53 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Dec 10, 2025
Ownership types recorded
none recorded
First install
Sep 19, 2012
Latest install
Dec 10, 2025
Counties
4
Utilities
PGE 53
CSLB license
967527

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201220
201350
201470
201550
201650
201760
201830
201900
202030
202120
202230
202351
202441
202532
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 53 interconnected installs (5.7% of the 53 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 10, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02445.3%not counted
NEM 2.02649.1%1 (3.8%)
Net Billing Tariff35.7%3 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Evans Energy Systems’s installs. No residential system in the file lists a third-party owner name that matches Evans Energy Systems exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of Evans Energy Systems’ 4 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 75.0%) used modules recorded as REC.

In the last 24 months, 4 of Evans Energy Systems’ 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 3 of Evans Energy Systems’ 4 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used batteries recorded as Enphase.

4 of 4 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC312
Hyundai1not in top list
Inverter makerEnphase447
FranklinWH11
Battery makerEnphase23
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 51 of 53 installs, inverters on 53. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Evans Energy Systems as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 66 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Feb 3, 2023 to Dec 18, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled266$66,000

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency266$66,0000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
967527Sole owner license (name not shown)CLEARC-10 Electrical Contractor; C-46 Solar ContractorNov 8, 2011Nov 30, 202745

License numbers are the ones the utilities recorded on the interconnection applications (45 of 53 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 967527. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Cruz49
Santa Clara2
Monterey1
San Mateo1

Top cities

CityInstalls
Santa Cruz26
Soquel10
Aptos5
Capitola4
Watsonville3
Los Gatos2
Davenport1
Hillsborough1
Salinas1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Evans Energy Systems32
EVANS ENERGY SYSTEMS19
Evans energy Systems1
Evans Energy systems1

Common questions

Where does Evans Energy Systems install solar?

Its installs are spread across 4 counties. The most are in Santa Cruz County (49 installs), followed by Santa Clara County (2).

How often does Evans Energy Systems install batteries with solar?

7.5% of its interconnected solar installs include battery storage across all years, and 75.0% in the last 24 months (3 of 4).

How many Evans Energy Systems installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 53 interconnected installs (5.7% of the 53 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.