HELIOFARM ELECTRIC CORPORATION has 34 residential solar installs interconnected in California, active in the records from 2019 through 2023 (Jan 14, 2019 to Sep 27, 2023), most of them in Santa Clara County (34). CSLB lists license 1047061 (HELIOFARM ELECTRIC CORPORATION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Nov 30, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
34
Last 24 months
0
Total capacity
192.6 kW DC
Median system size
5.1 kW DC
With battery storage
5.9% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 34 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jan 14, 2019
Latest install
Sep 27, 2023
Counties
1
Utilities
PGE 34
CSLB license
1047061

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201960
202060
202180
202271
202371
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 34 interconnected installs with a tariff recorded (34) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012.9%not counted
NEM 2.03397.1%2 (6.1%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on HELIOFARM ELECTRIC CORPORATION’s installs. No residential system in the file lists a third-party owner name that matches HELIOFARM ELECTRIC CORPORATION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 33 of HELIOFARM ELECTRIC CORPORATION’s 34 installs name a module maker in the “Generator Manufacturer” fields, and most of those (23, 69.7%) used modules recorded as LG.

Across all years, 34 of HELIOFARM ELECTRIC CORPORATION’s 34 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (34, 100.0%) used inverters recorded as Enphase.

Across all years, 2 of HELIOFARM ELECTRIC CORPORATION’s 34 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Enphase.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG023
SunPower04
Sanyo02
Canadian Solar01
Panasonic01
Inverter makerEnphase034
SMA01
Battery makerEnphase02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 33 of 34 installs, inverters on 34. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1047061HELIOFARM ELECTRIC CORPORATION (Corporation)CLEARC-10 Electrical ContractorNov 20, 2018Nov 30, 202634

License numbers are the ones the utilities recorded on the interconnection applications (34 of 34 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1047061. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Clara34

Top cities

CityInstalls
Sunnyvale23
Los Gatos3
Los Altos Hills2
San Jose2
Cupertino1
Los Altos1
Mountain View1
Saratoga1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HELIOFARM ELECTRIC CORPORATION31
Heliofarm Electric Corporation3

Common questions

Where does HELIOFARM ELECTRIC CORPORATION install solar?

Its installs are spread across 1 county. The most are in Santa Clara County (34 installs).

How often does HELIOFARM ELECTRIC CORPORATION install batteries with solar?

5.9% of its interconnected solar installs include battery storage across all years.

How many HELIOFARM ELECTRIC CORPORATION installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 34 interconnected installs with a tariff recorded (34) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.