Hunter Energy Solutions

How many solar installs has Hunter Energy Solutions done in California, and which license number is on its installs?

Hunter Energy Solutions has 88 residential solar installs interconnected in California, active in the records from 2014 through 2025 (Sep 4, 2014 to Dec 24, 2025), most of them in Placer County (75), Butte County (3) and El Dorado County (3). CSLB lists license 995559 (HUNTER ENERGY SOLUTIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
88
Last 24 months
5
Total capacity
1,179.5 kW DC
Median system size
10.5 kW DC
With battery storage
2.3% all time; 20.0% last 24 months
Third-party owned
0.0% of 88 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Dec 24, 2025
Ownership types recorded
none recorded
Median battery size
9.8 kWh (1 installs list a capacity)
First install
Sep 4, 2014
Latest install
Dec 24, 2025
Counties
10
Utilities
PGE 88
CSLB license
995559

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201450
201580
2016110
201750
201840
201970
202050
202161
202280
2023220
202430
202541
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 88 interconnected installs (1.1% of the 88 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 24, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02427.3%not counted
NEM 2.06371.6%1 (1.6%)
Net Billing Tariff11.1%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Hunter Energy Solutions’s installs. No residential system in the file lists a third-party owner name that matches Hunter Energy Solutions exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of Hunter Energy Solutions’ 5 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 40.0%) used modules recorded as SolarJuice American Inc..

In the last 24 months, 5 of Hunter Energy Solutions’ 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 60.0%) used inverters recorded as Yaskawa Solectria Solar.

In the last 24 months, 1 of Hunter Energy Solutions’ 5 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarJuice American Inc.229
SolarJuice Technology Inc.23
Znshine1not in top list
Inverter makerYaskawa Solectria Solar33
Enphase13
SolarEdge181
Battery makerEnphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 87 of 88 installs, inverters on 88. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Hunter Energy Solutions as developer on 2 battery storage projects and as installer on 2 (2 name it as both), 2 projects in all with 33 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Jan 4, 2021 to Nov 16, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled233$5,255

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage233$5,2550$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
995559HUNTER ENERGY SOLUTIONS INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorAug 12, 2014Aug 31, 202888

License numbers are the ones the utilities recorded on the interconnection applications (88 of 88 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 995559. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Placer75
Butte3
El Dorado3
Contra Costa1
Merced1
Nevada1
San Joaquin1
San Mateo1
Sutter1
Yolo1

Top cities

CityInstalls
Granite Bay50
Lincoln11
Loomis6
Rocklin6
Oroville3
Auburn1
Clayton1
El Dorado Hills1
Grass Valley1
Livingston1
Rescue1
Rio Oso1
Ripon1
Roseville1
San Mateo1

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HUNTER ENERGY SOLUTIONS INC47
Hunter Energy Solutions23
Hunter Energy Solutions, Inc.11
HUNTER ENERGY SOLUTIONS3
hunter energy solutions1
Hunter Energy Solutions Inc.1
Hunter Energy Solutions, Inc1
Hunter Energy Solutions, INC1

Common questions

Where does Hunter Energy Solutions install solar?

Its installs are spread across 10 counties. The most are in Placer County (75 installs), followed by Butte County (3).

How often does Hunter Energy Solutions install batteries with solar?

2.3% of its interconnected solar installs include battery storage across all years, and 20.0% in the last 24 months (1 of 5).

How many Hunter Energy Solutions installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 88 interconnected installs (1.1% of the 88 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.