INDEPENDENT SOLAR ELECTRIC

How many solar installs has INDEPENDENT SOLAR ELECTRIC done in California, and which license number is on its installs?

INDEPENDENT SOLAR ELECTRIC has 34 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Aug 22, 2020 to Jun 8, 2026), most of them in Nevada County (18), Yuba County (8) and Butte County (4). CSLB lists license 1027751 (INDEPENDENT SOLAR ELECTRIC LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
34
Last 24 months
9
Total capacity
348.7 kW DC
Median system size
8.7 kW DC
With battery storage
23.5% all time; 55.6% last 24 months
Third-party owned
0.0% of 34 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Jun 8, 2026
Ownership types recorded
none recorded
Median battery size
46 kWh (3 installs list a capacity)
First install
Aug 22, 2020
Latest install
Jun 8, 2026
Counties
5
Utilities
PGE 34
CSLB license
1027751

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202030
202150
202221
2023121
202462
202522
2026 (through Aug 31, 2026)42

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 34 interconnected installs (20.6% of the 34 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The latest Net Billing Tariff install was approved Jun 8, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.02779.4%3 (11.1%)
Net Billing Tariff720.6%5 (71.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on INDEPENDENT SOLAR ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches INDEPENDENT SOLAR ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 9 of INDEPENDENT SOLAR ELECTRIC’s 9 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (4, 44.4%) used modules recorded as EG4.

In the last 24 months, 9 of INDEPENDENT SOLAR ELECTRIC’s 9 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 55.6%) used inverters recorded as Sol-Ark.

In the last 24 months, 1 of INDEPENDENT SOLAR ELECTRIC’s 9 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as EG4.

3 of 8 battery-paired PG&E and SCE installs (37.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerEG444
Hyundai33
Mission Solar27
REC2not in top list
Auxin Solar1not in top list
Inverter makerSol-Ark58
Hoymiles2not in top list
SolarEdge211
Solis (Ginlong)1not in top list
Battery makerEG411

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 33 of 34 installs, inverters on 34. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names INDEPENDENT SOLAR ELECTRIC as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 29 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Mar 30, 2026 to Mar 30, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Pending Reservation129$30,010

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU129$30,0100$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1027751INDEPENDENT SOLAR ELECTRIC LLC (Limited Liability)CLEARC-10 Electrical ContractorJun 9, 2017Jan 31, 202733

License numbers are the ones the utilities recorded on the interconnection applications (33 of 34 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1027751. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Nevada18
Yuba8
Butte4
Placer3
Santa Cruz1

Top cities

CityInstalls
Grass Valley10
Nevada City4
Oroville4
Auburn2
Brownsville2
Loma Rica2
Oregon House2
Rough And Ready2
Dobbins1
Lincoln1
Marysville1
North San Juan1
Penn Valley1
Watsonville1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
INDEPENDENT SOLAR ELECTRIC28
INDEPENDENT SOLAR ELECTRIC LLC5
Independent Solar Electric1

Common questions

Where does INDEPENDENT SOLAR ELECTRIC install solar?

Its installs are spread across 5 counties. The most are in Nevada County (18 installs), followed by Yuba County (8).

How often does INDEPENDENT SOLAR ELECTRIC install batteries with solar?

23.5% of its interconnected solar installs include battery storage across all years, and 55.6% in the last 24 months (5 of 9).

How many INDEPENDENT SOLAR ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 34 interconnected installs (20.6% of the 34 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.