Jeremy Willer Construction Inc

How many solar installs has Jeremy Willer Construction Inc done in California, and which license number is on its installs?

Jeremy Willer Construction Inc has 171 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Apr 13, 2018 to Jul 30, 2026), most of them in Kern County (171). CSLB lists license 970585 (JEREMY WILLER CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
171
Last 24 months
14
Total capacity
612 kW DC
Median system size
3.3 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 171 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Apr 27, 2026
Ownership types recorded
none recorded
First install
Apr 13, 2018
Latest install
Jul 30, 2026
Counties
1
Utilities
PGE 171
CSLB license
970585

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018180
2019170
202030
2021240
2022660
2023200
2024120
202570
2026 (through Aug 31, 2026)40

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 171 interconnected installs (1.2% of the 171 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.016998.8%0 (0.0%)
Net Billing Tariff21.2%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Jeremy Willer Construction Inc’s installs. No residential system in the file lists a third-party owner name that matches Jeremy Willer Construction Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 14 of Jeremy Willer Construction Inc’s 14 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6, 42.9%) used modules recorded as JinkoSolar.

In the last 24 months, 14 of Jeremy Willer Construction Inc’s 14 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (14, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJinkoSolar68
Qcells4126
Zhejiang Sunpro Power Technology33
LONGi130
Inverter makerEnphase14170

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 171 of 171 installs, inverters on 171. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
970585JEREMY WILLER CONSTRUCTION INC (Corporation)CLEARB General Building ContractorMar 2, 2012Apr 30, 202882

License numbers are the ones the utilities recorded on the interconnection applications (82 of 171 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 970585. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Kern171

Top cities

CityInstalls
Bakersfield170
Shafter1

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Jeremy Willer Construction Inc80
Jeremy Willer Construction45
JEREMY WILLER CONSTRUCTION INC40
Jeremy WIller Construction3
Jeremy WIller COnstruction1
Jeremy Willer Construction inc1
Jeremy Willer COnstruction Inc1

Common questions

Where does Jeremy Willer Construction Inc install solar?

Its installs are spread across 1 county. The most are in Kern County (171 installs).

How often does Jeremy Willer Construction Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 14).

How many Jeremy Willer Construction Inc installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 171 interconnected installs (1.2% of the 171 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.