LA VERNE & SON

How many solar installs has LA VERNE & SON done in California, and which license number is on its installs?

LA VERNE & SON has 67 residential solar installs interconnected in California, active in the records from 2012 through 2025 (Nov 28, 2012 to Sep 10, 2025), most of them in Kern County (67). CSLB lists license 748936 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
67
Last 24 months
3
Total capacity
522.6 kW DC
Median system size
6.8 kW DC
With battery storage
16.4% all time; 100.0% last 24 months
Third-party owned
0.0% of 67 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
9 installs, latest Sep 10, 2025
Ownership types recorded
none recorded
Median battery size
20.1 kWh (2 installs list a capacity)
First install
Nov 28, 2012
Latest install
Sep 10, 2025
Counties
1
Utilities
PGE 61, SCE 6
CSLB license
748936

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201210
201300
201400
201500
201600
201700
201800
201930
202050
2021111
202290
2023291
202477
202522
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

9 of its 67 interconnected installs (13.4% of the 67 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Sep 10, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011.5%not counted
NEM 2.05785.1%2 (3.5%)
Net Billing Tariff913.4%9 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on LA VERNE & SON’s installs. No residential system in the file lists a third-party owner name that matches LA VERNE & SON exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of LA VERNE & SON’s 3 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 33.3%) used modules recorded as Axitec.

In the last 24 months, 3 of LA VERNE & SON’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 3 of LA VERNE & SON’s 3 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used batteries recorded as Enphase.

11 of 11 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAxitec15
Qcells110
United Renewable Energy122
Inverter makerEnphase363
Battery makerEnphase311

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 65 of 67 installs, inverters on 67. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
748936Sole owner license (name not shown)CLEARC-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning ContractorMay 5, 1998May 31, 202866

License numbers are the ones the utilities recorded on the interconnection applications (66 of 67 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 748936. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Kern67

Top cities

CityInstalls
Bakersfield60
Keene3
Tehachapi3
Arvin1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
LA VERNE & SON66
La Verne & Son1

Common questions

Where does LA VERNE & SON install solar?

Its installs are spread across 1 county. The most are in Kern County (67 installs).

How often does LA VERNE & SON install batteries with solar?

16.4% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (3 of 3).

How many LA VERNE & SON installs are under NEM 3.0 (the Net Billing Tariff)?

9 of its 67 interconnected installs (13.4% of the 67 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.