Moore Solar & Green Construction

How many solar installs has Moore Solar & Green Construction done in California, and which license number is on its installs?

Moore Solar & Green Construction has 35 residential solar installs interconnected in California, active in the records from 2013 through 2019 (Jan 29, 2013 to Dec 11, 2019), most of them in Los Angeles County (30), Orange County (4) and San Diego County (1). CSLB lists license 594693 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
35
Last 24 months
0
Total capacity
373.8 kW DC
Median system size
9.1 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 34 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jan 29, 2013
Latest install
Dec 11, 2019
Counties
3
Utilities
SCE 34, SDGE 1
CSLB license
594693

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201310
201400
201560
2016170
201750
201810
201950
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 35 interconnected installs with a tariff recorded (35) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02982.9%not counted
NEM 2.0617.1%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Moore Solar & Green Construction’s installs. No residential system in the file lists a third-party owner name that matches Moore Solar & Green Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 35 of Moore Solar & Green Construction’s 35 installs name a module maker in the “Generator Manufacturer” fields, and most of those (32, 91.4%) used modules recorded as LG.

Across all years, 34 of Moore Solar & Green Construction’s 35 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (18, 52.9%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG032
JA Solar02
SolarWorld01
Inverter makerEnphase018
SMA012
SolarEdge03
Power-One01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 35 of 35 installs, inverters on 34. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
594693Sole owner license (name not shown)CLEARB General Building Contractor; C-46 Solar ContractorMay 24, 1990Feb 28, 202723

License numbers are the ones the utilities recorded on the interconnection applications (23 of 35 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 594693. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles30
Orange4
San Diego1

Top cities

CityInstalls
La Canada Flintridge5
Altadena3
Beverly Hills2
Long Beach2
Redondo Beach2
Santa Monica2
South Pasadena2
Aliso Viejo1
Arcadia1
Glendora1
Hacienda Heights1
Huntington Beach1
La Canada1
Ladera Ranch1
Laguna Beach1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Moore Solar & Green Construction23
MOORE SOLAR & GREEN CONSTRUCTION7
MOORE SOLAR AND GREEN CONSTRUCTION4
Moore Solar and Green Construction1

Common questions

Where does Moore Solar & Green Construction install solar?

Its installs are spread across 3 counties. The most are in Los Angeles County (30 installs), followed by Orange County (4).

How often does Moore Solar & Green Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Moore Solar & Green Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 35 interconnected installs with a tariff recorded (35) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.