Pacific Energy Company

How many solar installs has Pacific Energy Company done in California, and which license number is on its installs?

Pacific Energy Company has 37 residential solar installs interconnected in California, active in the records from 2003 through 2017 (Aug 4, 2003 to Oct 12, 2017), most of them in San Luis Obispo County (30), San Bernardino County (3) and Los Angeles County (1). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
37
Last 24 months
0
Total capacity
126.6 kW DC
Median system size
2.7 kW DC
With battery storage
2.7% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 37 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Aug 4, 2003
Latest install
Oct 12, 2017
Counties
6
Utilities
PGE 33, SCE 4
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2003 to 2026

YearInstalls interconnectedWith battery storage
200310
200400
200500
200610
200700
200820
200940
201020
201190
201240
201330
201440
201500
201661
201710
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 37 interconnected installs with a tariff recorded (37) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03697.3%not counted
NEM 2.012.7%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Pacific Energy Company’s installs. Across all installers, 1 residential systems list a third-party owner name that matches Pacific Energy Company exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 37 of Pacific Energy Company’s 37 installs name a module maker in the “Generator Manufacturer” fields, and most of those (33, 89.2%) used modules recorded as SolarWorld.

Across all years, 37 of Pacific Energy Company’s 37 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (19, 51.4%) used inverters recorded as Enphase.

0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld033
Canadian Solar01
OutBack Power01
Sharp01
Shell Solar01
Inverter makerEnphase019
SMA06
Fronius04
Solectria Renewables, LLC04
Xantrex Technology Inc.02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 37 of 37 installs, inverters on 37. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Pacific Energy Company as developer on 1 battery storage project and as installer on 0 (0 name it as both), 1 projects in all with 15 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from May 26, 2021 to May 26, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
RRF Rejected115$2,877

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Not stated115$2,8770$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (6 of 37 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
San Luis Obispo30
San Bernardino3
Los Angeles1
Monterey1
Santa Barbara1
Shasta1

Top cities

CityInstalls
San Luis Obispo12
Arroyo Grande3
Atascadero3
Paso Robles3
Creston2
Grover Beach2
Los Osos2
Big Sur1
Cambria1
Chino1
Fontana1
La Puente1
Lakehead1
Morro Bay1
Nipomo1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Pacific Energy Company32
Pacific Energy4
Pacific energy Company1

Common questions

Where does Pacific Energy Company install solar?

Its installs are spread across 6 counties. The most are in San Luis Obispo County (30 installs), followed by San Bernardino County (3).

How often does Pacific Energy Company install batteries with solar?

2.7% of its interconnected solar installs include battery storage across all years.

How many Pacific Energy Company installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 37 interconnected installs with a tariff recorded (37) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.