Pure Energy Systems, Inc.

How many solar installs has Pure Energy Systems, Inc. done in California, and which license number is on its installs?

Pure Energy Systems, Inc. has 102 residential solar installs interconnected in California, active in the records from 2007 through 2011 (Mar 27, 2007 to Dec 5, 2011), most of them in Kern County (96), Kings County (4) and Butte County (1). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
102
Last 24 months
0
Total capacity
651.1 kW DC
Median system size
5.2 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 102 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Mar 27, 2007
Latest install
Dec 5, 2011
Counties
4
Utilities
PGE 101, SCE 1
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2007 to 2026

YearInstalls interconnectedWith battery storage
200740
2008140
2009340
2010370
2011130
201200
201300
201400
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 102 interconnected installs with a tariff recorded (102) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0102100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Pure Energy Systems, Inc.’s installs. No residential system in the file lists a third-party owner name that matches Pure Energy Systems, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 101 of Pure Energy Systems, Inc.’s 102 installs name a module maker in the “Generator Manufacturer” fields, and most of those (62, 61.4%) used modules recorded as SunPower.

Across all years, 102 of Pure Energy Systems, Inc.’s 102 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (61, 59.8%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower062
Suntech021
Sharp09
Westinghouse03
Canadian Solar02
Inverter makerSunPower061
SMA024
Enphase010
Xantrex Technology Inc.04
Fronius02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 101 of 102 installs, inverters on 102. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (1 of 102 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
Kern96
Kings4
Butte1
Fresno1

Top cities

CityInstalls
Bakersfield95
Corcoran2
Lemoore2
Fresno1
Oroville1
Ridgecrest1

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Pure Energy Systems, Inc.47
Pure Energy Systems, Inc18
Pure Energy Systems Inc17
Pure Energy Systems14
Pure Energy Systems, inc3
Pure energy Systems Inc1
Pure Energy Systems Inc.1
PUre Energy Systems, Inc1

Common questions

Where does Pure Energy Systems, Inc. install solar?

Its installs are spread across 4 counties. The most are in Kern County (96 installs), followed by Kings County (4).

How often does Pure Energy Systems, Inc. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Pure Energy Systems, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 102 interconnected installs with a tariff recorded (102) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.