Santa Cruz Solar has 51 residential solar installs interconnected in California, active in the records from 2001 through 2019 (Jul 25, 2001 to Aug 13, 2019), most of them in Santa Cruz County (47), Santa Clara County (2) and Monterey County (1). CSLB lists license 464505 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-4, C-36, C-43, C-46, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
51
Last 24 months
0
Total capacity
225.4 kW DC
Median system size
3.8 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 51 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jul 25, 2001
Latest install
Aug 13, 2019
Counties
4
Utilities
PGE 51
CSLB license
464505

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2001 to 2026

YearInstalls interconnectedWith battery storage
200110
200210
200330
200410
200520
200610
200750
200820
200940
201040
201130
201230
201350
201430
201560
201640
201700
201820
201910
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 51 interconnected installs with a tariff recorded (51) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04894.1%not counted
NEM 2.035.9%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Santa Cruz Solar’s installs. No residential system in the file lists a third-party owner name that matches Santa Cruz Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 49 of Santa Cruz Solar’s 51 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (16, 32.7%) used modules recorded as Sharp.

Across all years, 51 of Santa Cruz Solar’s 51 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (25, 49.0%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSharp016
SolarWorld09
SunPower07
Evergreen Solar05
Suniva05
Inverter makerSMA025
SunPower07
Fronius06
Solectria Renewables, LLC05
Enphase04

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 49 of 51 installs, inverters on 51. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
464505Sole owner license (name not shown)CLEARB General Building Contractor; C-4; C-36; C-43; C-46 Solar ContractorOct 19, 1984Oct 31, 202714

License numbers are the ones the utilities recorded on the interconnection applications (14 of 51 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 464505. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Cruz47
Santa Clara2
Monterey1
San Benito1

Top cities

CityInstalls
Santa Cruz24
Aptos10
Watsonville10
Los Gatos2
Carmel Valley1
La Selva Beach1
San Jose1
San Juan Bautista1
Scotts Valley1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Santa Cruz Solar47
Santa Cruz solar2
SANTA CRUZ SOLAR2

Common questions

Where does Santa Cruz Solar install solar?

Its installs are spread across 4 counties. The most are in Santa Cruz County (47 installs), followed by Santa Clara County (2).

How often does Santa Cruz Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Santa Cruz Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 51 interconnected installs with a tariff recorded (51) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.