Scurfield Solar & Heating

How many solar installs has Scurfield Solar & Heating done in California, and which license number is on its installs?

Scurfield Solar & Heating has 242 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Sep 14, 2013 to Jul 6, 2026), most of them in Humboldt County (238), Alameda County (1) and Contra Costa County (1). CSLB lists license 1036962 (SCURFIELD ELECTRIC HEATING & SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-36, C-46, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Scurfield Solar & Heating here carry more than one CSLB license number: 1036962 on 202 (CSLB holder SCURFIELD ELECTRIC HEATING & SOLAR, Arcata) and 841508 on 37 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
242
Last 24 months
3
Total capacity
1,284.8 kW DC
Median system size
4.8 kW DC
With battery storage
12.4% all time; 0.0% last 24 months
Third-party owned
0.0% of 242 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Dec 14, 2023
Ownership types recorded
none recorded
Median battery size
11.4 kWh (5 installs list a capacity)
First install
Sep 14, 2013
Latest install
Jul 6, 2026
Counties
5
Utilities
PGE 242
CSLB license
1036962, 841508

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201330
201440
201580
2016140
201770
2018180
2019250
2020233
2021349
2022396
20235712
202480
202510
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 242 interconnected installs (0.4% of the 242 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 14, 2023.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03414.0%not counted
NEM 2.020785.5%24 (11.6%)
Net Billing Tariff10.4%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Scurfield Solar & Heating’s installs. No residential system in the file lists a third-party owner name that matches Scurfield Solar & Heating exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of Scurfield Solar & Heating’s 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used modules recorded as REC.

In the last 24 months, 3 of Scurfield Solar & Heating’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of Scurfield Solar & Heating’s 3 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

21 of 30 battery-paired PG&E and SCE installs (70.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC240
Silfab113
Inverter makerEnphase3132
Battery makerSunPower016
Enphase03
FranklinWH02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 215 of 242 installs, inverters on 242. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Scurfield Solar & Heating as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 21 kWh of storage. 2 have the status Paid, with $11,234 in current incentive allocations. Applications were received from Nov 16, 2021 to Jul 8, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid221$11,234

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency110$9,5181$9,518
Small Residential Storage111$1,7161$1,716

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1036962SCURFIELD ELECTRIC HEATING & SOLAR (Corporation)CLEARC-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-46 Solar ContractorMar 19, 2018Mar 31, 2028202
841508Not found in the CSLB License Master file pulled Nov 4, 202637

License numbers are the ones the utilities recorded on the interconnection applications (239 of 242 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1036962. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Humboldt238
Alameda1
Contra Costa1
Sonoma1
Trinity1

Top cities

CityInstalls
Eureka86
Arcata44
Mckinleyville44
Fortuna17
Bayside15
Trinidad13
Blue Lake5
Ferndale4
Kneeland4
Hydesville2
Burnt Ranch1
Carlotta1
Danville1
Oakland1
Rio Dell1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SCURFIELD SOLAR AND HEATING169
Scurfield Solar & Heating63
Scurfield Solar and Heating6
scurfield solar and heating4

Common questions

Where does Scurfield Solar & Heating install solar?

Its installs are spread across 5 counties. The most are in Humboldt County (238 installs), followed by Alameda County (1).

How often does Scurfield Solar & Heating install batteries with solar?

12.4% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 3).

How many Scurfield Solar & Heating installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 242 interconnected installs (0.4% of the 242 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.