Solar Projects Unlimited

How many solar installs has Solar Projects Unlimited done in California, and which license number is on its installs?

Solar Projects Unlimited has 108 residential solar installs interconnected in California, active in the records from 2009 through 2026 (Jun 10, 2009 to Jul 6, 2026), most of them in Humboldt County (104) and Trinity County (4). CSLB lists license 913359 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
108
Last 24 months
14
Total capacity
689.8 kW DC
Median system size
6.1 kW DC
With battery storage
4.6% all time; 35.7% last 24 months
Third-party owned
0.0% of 108 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
12 installs, latest Jul 6, 2026
Ownership types recorded
none recorded
Median battery size
39.9 kWh (3 installs list a capacity)
First install
Jun 10, 2009
Latest install
Jul 6, 2026
Counties
2
Utilities
PGE 108
CSLB license
913359

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200910
201010
201120
201200
201310
201410
201580
2016130
201740
201830
201910
202070
202140
2022140
2023210
2024130
2025113
2026 (through Aug 31, 2026)32

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

12 of its 108 interconnected installs (11.1% of the 108 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 41.7% of those include battery storage. The latest Net Billing Tariff install was approved Jul 6, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02725.0%not counted
NEM 2.06963.9%0 (0.0%)
Net Billing Tariff1211.1%5 (41.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Solar Projects Unlimited’s installs. No residential system in the file lists a third-party owner name that matches Solar Projects Unlimited exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 14 of Solar Projects Unlimited’s 14 installs name a module maker in the “Generator Manufacturer” fields, and most of those (13, 92.9%) used modules recorded as Qcells.

In the last 24 months, 14 of Solar Projects Unlimited’s 14 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (7, 50.0%) used inverters recorded as APsystems (Altenergy Power System).

In the last 24 months, 2 of Solar Projects Unlimited’s 14 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used batteries recorded as Enphase.

2 of 5 battery-paired PG&E and SCE installs (40.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1381
Briggs & Stratton, LLC33
JinkoSolar1not in top list
Sharp14
Inverter makerAPsystems (Altenergy Power System)753
Sol-Ark55
SMA247
Enphase11
FranklinWH1not in top list
Battery makerEnphase11
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 106 of 108 installs, inverters on 108. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
913359Sole owner license (name not shown)CLEARC-46 Solar ContractorApr 3, 2008Apr 30, 2028103

License numbers are the ones the utilities recorded on the interconnection applications (103 of 108 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 913359. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Humboldt104
Trinity4

Top cities

CityInstalls
Eureka35
Arcata25
Mckinleyville25
Bayside5
Burnt Ranch4
Trinidad4
Fortuna3
Willow Creek2
Blue Lake1
Hoopa1
Hydesville1
Kneeland1
Redcrest1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR PROJECTS UNLIMITED73
Solar Projects Unlimited35

Common questions

Where does Solar Projects Unlimited install solar?

Its installs are spread across 2 counties. The most are in Humboldt County (104 installs), followed by Trinity County (4).

How often does Solar Projects Unlimited install batteries with solar?

4.6% of its interconnected solar installs include battery storage across all years, and 35.7% in the last 24 months (5 of 14).

How many Solar Projects Unlimited installs are under NEM 3.0 (the Net Billing Tariff)?

12 of its 108 interconnected installs (11.1% of the 108 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 41.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.